|
||||||||||||||||||
|
![]() |
![]() |
Company Web Site: www.agnico-eagle.com
(NI) 43-101 reports from projects located in: Canada (CA) | Finland (FI) | Mexico (MX)
This report is based on NI 43-101 disclosures and fully diluted share counts available on: 2009-03-20. Metrics have been updated with stock price and metal prices in effect at the close of Canadian markets on 2010-03-11.
External Links: Yahoo News and Quotes | Yahoo Message Board | StockCharts | StockHouse | Canadian Insider Trading
More External Links: Knobias | SmartMoney | MFFAIS | Q1 2009 CC Transcript
Recent Production
Source(s): 2009 and 2010 gold production outlook is from Agnico-Eagle reports Q1 2009 results, April 29, 2009
- 2010 : 2010 Gold Production is be approximately 1.2 million ounces.
- 2009 : 2009 Gold Production is anticapted to be 550,000 ounces to 575,000 ounces.
[AEM] record nine month gold production of 329,628 oz.- 2008 : 2008 Gold Production: 276,762 oz
- 2007 : 2007 Gold Production: 230,992 oz
2008 gold production is from Agnico-Eagle reports 2008 results; Record quarterly and annual gold production; Record gold reserves and resources 02/18/2009.GoldMinerPulse Most Optimistic Resource Estimate Summary (MORE):
Metrics last with prices in effect at the TSX/TSXV close on 2010-03-11
Project/Deposit CC MVpSh PP% MI% I% Gold Silver Copper Zinc LaRonde CA $61.18 79% 8% 13% 6.29 M oz 49.17 M oz 133.56 K t 720.35 K t Kittila FI $39.17 53% 6% 41% 6.05 M oz Pinos Altos MX $38.81 86% 9% 5% 4.21 M oz 115.61 M oz Meadowbank CA $36.31 65% 27% 8% 5.61 M oz Goldex CA $16.26 62% 1% 37% 2.51 M oz Lapa CA $9.03 76% 10% 14% 1.39 M oz Bousquet CA $4.58 0 44% 56% 707.72 K oz Ellison CA $1.44 0 34% 66% 222.61 K oz GoldMinerPulse Metrics - Total All Projects/Deposits by Metal, prices from 2010-Mar-11 Metric / Metal Gold Silver Copper Zinc Metal Totals 26.99 M oz 164.78 M oz 133.56 K t 720.35 K t Metal Prices in US$ (from 2010-03-11) $1,108.90 per oz $17.15 per oz $3.36580 per lb $1.05510 per lb Metal Value per Share (MVpSh)
(Shown in US$ and based on fully diluted share count shown below)$174.71 $16.50 $5.79 $9.78 Percentage of Total Metal Value 84.49% 7.98% 2.80% 4.73% PP% | MI% | I% 67% | 12% | 21% 85% | 10% | 5% 77% | 7% | 16% 81% | 14% | 5% GoldMinerPulse Metrics - All Metals from All Projects/Deposits and Prices from 2010-Mar-11 Metal Value per Share (MVpSh) US$206.78 Average Ore Value per Tonne US$ Metal Value Leverage (MVL) 3.49 Market Capitalization as % of Metal Value 28.7% Recent Stock Price C$60.77 (TSX/TSXV close on 2010-03-11.)
Conversion rate used: 1 Cnd$ = 0.976275 US$ )Fully Diluted Share Count 171.30 M ( Diluted share count taken from p. 7 of 29 of the Third Quarter 2009 Results Presentation, dated October 29, 2009. ) PP% | MI% | I% 69% | 12% | 19% Gold Metrics-- all Projects/Deposits Average Gold Ore Grade g/t Market Capitalization
per oz of Gold In Ground$376.56 US$ | 385.71 C$ Gold Eq Oz Estimate 31.94 M oz ( 26.99 M oz are in ground) Market Capitalization
per oz of Gold Equilavent$318.17 US$ | 325.90 C$ See terms for more about GoldMinerPulse metrics. Additional Notes:
Gold Sales Hedging - About Us page at company web site, November 2008.
Quote:
Agnico-Eagle has traditionally sold all of its production at the spot price of gold, in keeping with a policy of not selling forward future gold production. This policy enables shareholders to participate fully in rising precious metal prices.AEM is part of the AMEX Gold BUGS (Basket of Unhedged Gold Stocks) Index (November 2008).GoldMinerPulse Coverage Status:
- GoldMinerPulse coverage of Agnico-Eagle Mines Limited is complete pending a final internal review.
(NI) 43-101 Report:
Title:
Date: (0 pages)
Updates: Reserve and resource estimates taken from Agnico-Eagle reports 2008 results; Record quarterly and annual gold production; Record gold reserves and resources 02/18/2009.
Project Location: Quebec, Canada / Mining Region: Cadillac-Larder Lake
Map View: View project on a Google Map.
Most Optimistic Resource Estimates (MORE):
•Indicated•Inferred
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $2.00 308.44 K oz 5.630 g/t 1.70 M t Estimate notes: See Record gold reserves and resources NR, 02/18/2009
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $2.58 399.28 K oz 7.450 g/t 1.67 M t Estimate notes:
(NI) 43-101 Report:
Title:
Date: (0 pages)
Updates: Reserve and resource estimates taken from Agnico-Eagle reports 2008 results; Record quarterly and annual gold production; Record gold reserves and resources 02/18/2009.
Project Location: Quebec, Canada / Mining Region: Cadillac-Larder Lake
Map View: View project on a Google Map.
Most Optimistic Resource Estimates (MORE):
•Indicated•Inferred
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $0.49 75.79 K oz 5.680 g/t 415.00 K t Estimate notes:
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $0.95 146.82 K oz 5.810 g/t 786.00 K t Estimate notes:
(NI) 43-101 Report:
Title: TECHNICAL REPORT ON THE ESTIMATION OF MINERAL RESOURCES AND RESERVES FOR THE GOLDEX EXTENSION ZONE GOLDEX PROJECT, VAL-D’OR, QUÉBEC, CANADA
Date: 2005-09-09 (171 pages)
Updates: Reserve and resource estimates taken from Agnico-Eagle reports 2008 results; Record quarterly and annual gold production; Record gold reserves and resources 02/18/2009.
Project Location: Quebec, Canada
Map View: View project on a Google Map.
Most Optimistic Resource Estimates (MORE):
•Proven•Probable
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $0.18 27.21 K oz 1.950 g/t 434.00 K t Estimate notes: See Record gold reserves and resources NR, 02/18/2009
•Indicated
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $9.98 1.54 M oz 2.050 g/t 23.39 M t Estimate notes:
•Inferred
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $0.08 12.66 K oz 1.790 g/t 220.00 K t Estimate notes:
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $6.02 929.69 K oz 2.420 g/t 11.95 M t Estimate notes:
(NI) 43-101 Report:
Title: Technical Report on the July 31, 2008 Mineral Resource and Mineral Reserve Estimate of the Kittila Mine Project, Finland
Date: 2008-12-01 (146 pages)
Updates: Reserve and resource estimates taken from Agnico-Eagle reports 2008 results; Record quarterly and annual gold production; Record gold reserves and resources 02/18/2009.
Project Location: , Finland
Map View: View project on a Google Map.
Most Optimistic Resource Estimates (MORE):
•Probable•Probable
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $0.20 30.97 K oz 4.840 g/t 199.00 K t Estimate notes: See Record gold reserves and resources NR, 02/18/2009
•Indicated
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $20.67 3.19 M oz 4.690 g/t 21.17 M t Estimate notes:
•Inferred
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $2.16 333.67 K oz 2.990 g/t 3.47 M t Estimate notes:
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $16.14 2.49 M oz 4.420 g/t 17.55 M t Estimate notes:
(NI) 43-101 Report:
Title: 2005 LaRonde Mineral Resource & Mineral Reserve Estimate Agnico-Eagle Mines Ltd. LaRonde Division
Date: 2007-03-23 (115 pages)
Updates: Reserve and resource estimates taken from Agnico-Eagle reports 2008 results; Record quarterly and annual gold production; Record gold reserves and resources 02/18/2009.
Project Location: Quebec, Canada / Mining Region: Cadillac-Larder Lake
Map View: View project on a Google Map.
Most Optimistic Resource Estimates (MORE):
•Proven•Probable
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $2.34 361.69 K oz 2.760 g/t 4.08 M t Silver $0.89 8.89 M oz 67.870 g/t 4.08 M t Copper $0.58 13.45 K t 3,300.000 g/t 4.08 M t Lead $0.20 15.08 K t 3,700.000 g/t 4.08 M t Zinc $1.81 133.29 K t 32,700.000 g/t 4.08 M t Estimate notes: See Record gold reserves and resources NR, 02/18/2009
•Indicated
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $29.85 4.61 M oz 4.520 g/t 31.74 M t Silver $3.19 31.81 M oz 31.180 g/t 31.74 M t Copper $3.85 88.86 K t 2,800.000 g/t 31.74 M t Lead $0.50 38.08 K t 1,200.000 g/t 31.74 M t Zinc $6.12 450.64 K t 14,200.000 g/t 31.74 M t Estimate notes:
•Inferred
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $2.42 373.55 K oz 1.830 g/t 6.35 M t Silver $0.55 5.46 M oz 26.770 g/t 6.35 M t Copper $0.41 9.52 K t 1,500.000 g/t 6.35 M t Lead $0.13 10.16 K t 1,600.000 g/t 6.35 M t Zinc $1.34 98.41 K t 15,500.000 g/t 6.35 M t Estimate notes:
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $6.07 938.08 K oz 5.910 g/t 4.94 M t Silver $0.30 3.00 M oz 18.910 g/t 4.94 M t Copper $0.94 21.72 K t 4,400.000 g/t 4.94 M t Lead $0.05 3.95 K t 800.000 g/t 4.94 M t Zinc $0.52 38.01 K t 7,700.000 g/t 4.94 M t Estimate notes:
(NI) 43-101 Report:
Title: Technical Report on the Lapa Gold Project, Cadillac Township, Quebec, Canada
Date: 2006-05-32 (185 pages)
Updates: Reserve and resource estimates taken from Agnico-Eagle reports 2008 results; Record quarterly and annual gold production; Record gold reserves and resources 02/18/2009.
Project Location: Quebec, Canada
Map View: View project on a Google Map.
Most Optimistic Resource Estimates (MORE):
•Proven•Probable
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $0.04 5.57 K oz 7.530 g/t 23.00 K t Estimate notes: See Record gold reserves and resources NR, 02/18/2009
•Indicated
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $6.83 1.06 M oz 8.800 g/t 3.73 M t Estimate notes:
•Inferred
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $0.90 138.35 K oz 4.360 g/t 987.00 K t Estimate notes:
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $1.26 195.00 K oz 7.970 g/t 761.00 K t Estimate notes:
(NI) 43-101 Report:
Title: TECHNICAL REPORT ON THE MINERAL RESOURCES AND MINERAL RESERVES Dated September 30th, 2008 MEADOWBANK GOLD PROJECT NUNAVUT, CANADA
Date: 2008-12-05 (169 pages)
Updates: Reserve and resource estimates taken from Agnico-Eagle reports 2008 results; Record quarterly and annual gold production; Record gold reserves and resources 02/18/2009.
Project Location: Nunavut, Canada
Map View: View Meadowbank project on a Google Map.
Most Optimistic Resource Estimates (MORE):
•Probable•Indicated
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $23.53 3.64 M oz 3.450 g/t 32.77 M t Estimate notes: See Record gold reserves and resources NR, 02/18/2009
Cut-off: breakeven grade of 1.57 g/t for the Portage and Goose Island pits, and 1.58 g/t for the Vault pit.
•Inferred
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $9.92 1.53 M oz 2.170 g/t 21.96 M t Estimate notes:
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $2.87 442.69 K oz 2.780 g/t 4.95 M t Estimate notes:
(NI) 43-101 Report:
Title: PINOS ALTOS GOLD-SILVER PROJECT CHIHUAHUA STATE, MEXICO TECHNICAL REPORT ON THE MINERAL RESOURCES AND RESERVES AS OF DECEMBER 31ST 2008
Date: 2009-03-20 (310 pages)
Updates: Reserve and resource estimates taken from Agnico-Eagle reports 2008 results; Record quarterly and annual gold production; Record gold reserves and resources 02/18/2009.
Project Location: Chihuahua, Mexico / Mining Region: Sierra Madre Occidental
Map View: View project on a Google Map.
Most Optimistic Resource Estimates (MORE):
•Proven•Probable
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $0.03 4.21 K oz 1.350 g/t 97.00 K t Silver $0.01 59.50 K oz 19.080 g/t 97.00 K t Estimate notes: See Record gold reserves and resources NR, 02/18/2009
•Indicated
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $23.24 3.59 M oz 2.680 g/t 41.67 M t Silver $10.01 99.95 M oz 74.610 g/t 41.67 M t Estimate notes:
•Inferred
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $2.59 400.86 K oz 1.000 g/t 12.47 M t Silver $1.05 10.45 M oz 26.080 g/t 12.47 M t Estimate notes:
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $1.37 212.19 K oz 1.650 g/t 4.00 M t Silver $0.51 5.14 M oz 39.950 g/t 4.00 M t Estimate notes:
![]() |
![]() |
![]() |
![]() |
|
| PartyCasino is the online casino operated by PartyGaming Plc. PartyGaming Plc is listed on the London Stock Exchange and is part of the FTSE 250 in the Travel & Leisure sector. | ||||