|
||||||||||||||||||
|
![]() |
![]() |
Company Web Site: www.alamosgold.com
This report is based on NI 43-101 disclosures and fully diluted share counts available on: 2010-04-01. Metrics have been updated with stock price and metal prices in effect at the close of Canadian markets on 2010-09-02.
External Links: Yahoo News and Quotes | Stock Chart | StockHouse | Canadian Insider Trading
More External Links: Canadian Insider Trading
Recent Production
Source(s): 2008 full year production and 2009 estimates are taken from Alamos Gold Inc. Reports Strong Fourth Quarter and Full Year 2008 Production and Provides 2009 Operating Forecast, 1/8/2009
- 2009 : Quote:
In 2009, the Company is forecasting gold production of 145,000 to 160,000 ounces from the Mulatos mine at a total cash cost (including the 5% royalty) of $350 per ounce.- 2008 : Full year 2008 gold production of 151,000 oz.
- 2007 : Gold production for 2007 was 106,200 oz.
GoldMinerPulse Most Optimistic Resource Estimate Summary (MORE):
Metrics last with prices in effect at the TSX/TSXV close on 2010-09-02
Project/Deposit CC MVpSh PP% MI% I% Gold Silver Mulatos MX $65.81 38% 42% 20% 6.29 M oz Agi Dagi & Kirazli TR $23.30 0 66% 34% 1.94 M oz 18.08 M oz GoldMinerPulse Metrics - Total All Projects/Deposits by Metal, prices from 2010-Sept-02 Metric / Metal Gold Silver Metal Totals 8.23 M oz 18.08 M oz Metal Prices in US$ (from 2010-09-02) $1,251.30 per oz $19.69 per oz Metal Value per Share (MVpSh)
(Shown in US$ and based on fully diluted share count shown below)$86.13 $2.98 Percentage of Total Metal Value 96.66% 3.34% PP% | MI% | I% 29% | 48% | 23% 0 | 59% | 41% GoldMinerPulse Metrics - All Metals from All Projects/Deposits and Prices from 2010-Sept-02 Metal Value per Share (MVpSh) US$89.11 Average Ore Value per Tonne US$32.71 Metal Value Leverage (MVL) 5.56 Market Capitalization as % of Metal Value 18.0% Recent Stock Price C$16.89 (TSX/TSXV close on 2010-09-02.)
Conversion rate used: 1 Cnd$ = 0.949244 US$ )Fully Diluted Share Count 119.56 M ( For fully diluted share count, the company's Share Capital Web page (viewed April 2010). ) PP% | MI% | I% 28% | 48% | 23% Gold Metrics-- all Projects/Deposits Average Gold Ore Grade 0.786 g/t Market Capitalization
per oz of Gold In Ground$232.92 US$ | 245.37 C$ Gold Eq Oz Estimate 8.51 M oz ( 8.23 M oz are in ground) Market Capitalization
per oz of Gold Equilavent$225.14 US$ | 237.17 C$ See terms for more about GoldMinerPulse metrics. Additional Notes:
Fronteer and Teck announce proposed sale of Agi Dagi and Kirazli gold projects to Alamos, September 23, 2009 News Release
As of the September 28, 2009 update at GoldMinerPulse, the Agi dagi and Kirazli deposits are tracked under Alamos Gold Inc. and not Fronteer Development Group (FRG).
GoldMinerPulse Coverage Status:
- GoldMinerPulse coverage of Alamos Gold Inc is complete pending a final internal review.
(NI) 43-101 Report:
Title: Technical Report on the Ağı dağı Gold Property Çanakkale Province, Turkey
Date: 2007-08-01 (119 pages)
Updates: Resource data was taken from Alamos Gold Inc.: Turkish Assets Demonstrate Robust Economics, Projects Advance to Pre-Feasibility, March 29, 2010.
Project Location: Canakkale, Turkey
Map View: View the Agi Dagi gold property on a Google Map.
Most Optimistic Resource Estimates (MORE):
•Indicated•Inferred
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $13.74 1.31 M oz 0.640 g/t 63.78 M t Silver $1.76 10.66 M oz 5.200 g/t 63.78 M t Estimate notes: Alamos Gold Inc.: Turkish Assets Demonstrate Robust Economics, Projects Advance to Pre-Feasibility, March 29, 2010.
Cut-off grades of approximately 0.2 g/t Au for oxide and 1.0 g/t Au for sulphide material:
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $6.58 629.07 K oz 0.740 g/t 26.44 M t Silver $1.22 7.41 M oz 8.720 g/t 26.44 M t Estimate notes: See Indicated notes.
(NI) 43-101 Report:
Title: MINAS DE ORO NACIONAL, S.A. DE C.V. MULATOS PROJECT MILL TECHNICAL REPORT
Date: 2009-04-17 (108 pages)
Updates: See Alamos Reports a 17% Increase in Proven and Probable Reserves at Mulatos and Plans to Increase Crusher Throughput by Up to 20% March 31, 2010 News Release.
Project Location: Sonora, Mexico / Mining Region: Sierra Madre Occidental
Map View: View the Mulatos mine on a Google Map.
Most Optimistic Resource Estimates (MORE):
•Proven + Probable•Measured + Indicated
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $25.06 2.39 M oz 1.210 g/t 61.56 M t Estimate notes: Alamos Reports a 17% Increase in Proven and Probable Reserves at Mulatos and Plans to Increase Crusher Throughput by Up to 20% March 31, 2010 News Release.
Reserve cut-off for the Mulatos and Victor pits is determined as a net of process value of $0.10 per tonne,
•Inferred
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $27.69 2.65 M oz 0.670 g/t 122.84 M t Estimate notes: See Proven + Probable note.
Cut-off grade 0.30 g/t Au.
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $13.06 1.25 M oz 0.760 g/t 51.06 M t Estimate notes: See Proven + Probable note.
0.3 g/t Cut-off
|
|
![]() |