GoldMinerPulse.com -- Avino Silver and Gold Mines Ltd.:  (NI) 43-101 Metal Valuation Report

Home Gold List Silver List Index Blogs FAQs Terms Talk Back Map View
million_dollar_hand PartyPoker Signup PartyPoker Signup
Avino Silver and Gold Mines Ltd. (ASM)

Company Web Site: www.avino.com

(NI) 43-101 reports from projects located in: Mexico (MX)

This report is based on NI 43-101 disclosures and fully diluted share counts available on: 2010-01-18. Metrics have been updated with stock price and metal prices in effect at the close of Canadian markets on 2010-03-09.

External Links: Yahoo News and Quotes  |  MB  |  StockCharts  |  StockHouse  |  Canadian Insider Trading

GoldMinerPulse Most Optimistic Resource Estimate Summary (MORE):
Metrics last with prices in effect at the TSX/TSXV close on 2010-03-09

Project/Deposit CC MVpSh  PP%  MI%  I% GoldSilverLeadZinc
    Avino Mine oxide tailingsMX$7.0300100%35.63 K oz    6.39 M oz              
    Avino Mine San GonzaloMX$6.9800100%37.28 K oz    4.74 M oz    4.44 K t    6.66 K t    
    Avino Sulfide TailingsMX$4.5100100%31.70 K oz    3.52 M oz              
 
GoldMinerPulse Metrics - Total All Projects/Deposits by Metal, prices from 2010-Mar-09
Metric / MetalGoldSilverLeadZinc
    Metal Totals104.61 K oz    14.65 M oz    4.44 K t    6.66 K t    
    Metal Prices in US$ (from 2010-03-09)$1,120.10 per oz    $17.27 per oz    $1.00590 per lb    $1.05740 per lb    
    Metal Value per Share (MVpSh)
(Shown in US$ and based on fully diluted share count shown below)
$5.48    $11.84    $0.46    $0.73    
    Percentage of Total Metal Value29.62%    63.96%    2.49%    3.93%    
    PP% | MI% | I%0 | 0 | 100%    0 | 0 | 100%    0 | 0 | 100%    0 | 0 | 100%    
 
GoldMinerPulse Metrics - All Metals from All Projects/Deposits and Prices from 2010-Mar-09
    Metal Value per Share (MVpSh)   US$18.51
    Average Ore Value per Tonne   US$72.78
    Metal Value Leverage (MVL)    25.33
    Market Capitalization as % of Metal Value   3.9%
    Recent Stock Price   C$0.75   (TSX/TSXV close on 2010-03-09.)
  Conversion rate used: 1 Cnd$ = 0.974456 US$ )
    Fully Diluted Share Count   21.37 M    ( Fully diluted share count take from p. 33 of 34 of Reactivating the Avino Mine presentation. And additional 75,000 added to the count to reflect Grant of Stock Options, Jan 15, 2010. )
    PP% | MI% | I%   0 | 0 | 100%
Silver Metrics-- all Projects/Deposits
    Average Silver Ore Grade   83.8 g/t
    Market Capitalization
    per oz of Silver In Ground
   $1.07   US$  |   1.09   C$
    Silver Eq Oz Estimate   22.91 M oz   ( 14.65 M oz are in ground)
    Market Capitalization
    per oz of Silver Equilavent
   $0.68   US$  |   0.70   C$
 
See terms for more about GoldMinerPulse metrics.

Additional Notes:

Other ASM Projects    -   Project listed at Avino web site, October 2008.

  • Minto Property, British Columbia, Canada
  • Eagle Property, Yukon Territory, Canada
  • Olympic-Kelvin Property, British Columbia, Canada
  • Aumax Property, British Columbia, Canada
 

GoldMinerPulse Coverage Status:

  • GoldMinerPulse coverage of Avino Silver and Gold Mines Ltd. is complete pending a final internal review.


Avino Mine San Gonzalo    -  ^top^

(NI) 43-101 Report:

Title: RESOURCE ESTIMATE on the SAN GONZALO VEIN A Part of the AVINO MINE DURANGO, MEXICO
Date: 2009-08-31 (46 pages)

Updates:

Project Location: Durango State, Mexico  /  Mining Region: Sierra Madre Occidental

Map View: View the Avino Mine on a Google Map.

Most Optimistic Resource Estimates (MORE):

   •Inferred
MetalMVpShContained Metal QuantityOre GradeOre Quantity
   Gold$1.95    37.28 K oz     2.610 g/t     444.25 K t    
   Silver$3.83    4.74 M oz     332.000 g/t     444.25 K t    
   Lead$0.46    4.44 K t       10,000.000 g/t     444.25 K t    
   Zinc$0.73    6.66 K t       15,000.000 g/t     444.25 K t    
Estimate notes:


Avino Mine oxide tailings    -  ^top^

(NI) 43-101 Report:

Title: Form 43 - 101F1 Technical Report: Tailings Retreatment - Process Options, Document No. 0551920100-REP-R0002-01
Date: 2006-03-31 (415 pages)

Updates: NI 43-101 compliant inferred tailings resource calculation

Project Location: Durango, Mexico  /  Mining Region: Sierra Madre Occidental

Map View: View project on a Google Map.

Most Optimistic Resource Estimates (MORE):

   •Inferred
MetalMVpShContained Metal QuantityOre GradeOre Quantity
   Gold$1.87    35.63 K oz     0.530 g/t     2.09 M t    
   Silver$5.16    6.39 M oz     95.000 g/t     2.09 M t    
Estimate notes: See NI 43-101 p. 15 of 415
oxide tailings


Avino Sulfide Tailings    -  ^top^

(NI) 43-101 Report:

Title: cutAndPasteExactTitleOfTheReportHere
Date: (0 pages)

Updates: NI 43-101 compliant inferred tailings resource calculation

Project Location: Durango, Mexico

Most Optimistic Resource Estimates (MORE):

   •Inferred
MetalMVpShContained Metal QuantityOre GradeOre Quantity
   Gold$1.66    31.70 K oz     0.340 g/t     2.90 M t    
   Silver$2.85    3.52 M oz     37.780 g/t     2.90 M t    
Estimate notes: See NI 43-101 compliant inferred tailings resource calculation.
cutOffNotes

Gif Banners Gif Banners Gif Banners Monopoly gif banner
PartyCasino is the online casino operated by PartyGaming Plc. PartyGaming Plc is listed on the London Stock Exchange and is part of the FTSE 250 in the Travel & Leisure sector.