GoldMinerPulse Report: Astur Gold Corp. Metal Value

This page is now out of date. Please visit GoldMinerPulse Home Page to access current pages, which are now updated with daily market closing prices and sedar.com document filings.



Get Adobe Flash player Seabridgegold.net    

Astur Gold Corp. (AST) NI 43-101 Metal Value Report

Astur Gold Corp. is developing its 100% owned Salave Gold project in northern Spain. In Febraury, 2011, the company released a Preliminary Economic Assessment on Salave. The company is focused on bringing Salave into production as soon as possible, initially as an underground mine. In September, 2011, the company submitted an application for an underground mine permit and is conducting an Environmental Impact Study.

The Astur Gold Corp. website is at www.asturgold.com.

Information Links: Yahoo News and Quotes | Yahoo Message Board | StockCharts | Canadian Insider Trading

GoldMinerPulse Metrics Summary

This report is based on NI 43-101 resource and reserve disclosures and fully diluted share counts available on 2012-03-30.

The GoldMinerPulse metrics, presented below in table format, are based on all projects and all in situ metals and are updated daily with closing market prices.

Astur Gold Corp. Metric Summary
General MetricValue on 2013-05-24
In Situ Metal Value per Share (MVpSh)US$76.36
Average Ore Value per TonneUS$129.00
Metal Value Leverage (MVL)-no stock price-
Market Capitalization as a Percentage of Metal Value - price unavailable
Recent Closing Stock PriceC$
[note 1]
Fully Diluted Share Count36.68 M
[note 2]
Percentage In Situ Proven + Probable Reserve0%
Percentage In Situ Measured + Indicated Resource83%
Percentage In Situ Inferred Resource17%
Gold Specific Metrics
MetricValue on 2013-05-24
Gold Reserves + Resources2.02 M oz
Average Gold Ore Grade2.9 g/t
Market Capitalization per oz of Gold In SituUS$0.00
( C$0.00 )
Gold Equivalent Ounces Estimate2.02 M oz
Market Capitalization per oz of Gold EquivalentUS$0.00
( C$0.00 )
 

GoldMinerPulse Most Optimistic Resource Estimate Summary (MORE)

All metal counts in this section are based on the combined Proven + Probable reserves plus the Measured + Indicated and Inferred resources.

Metal Summary Based on Closing Prices on 2013-05-24
Metric / MetalGold
Total Counts (reserves + resources)2.02 M oz
Metal Prices in US$ (from 2013-05-24)$1,384.20 / oz
Metal Value per Share (MVpSh)
Shown in US$. Based on fully diluted share count
$76.36
Percentage of Total Metal Value100.00%
Metal Value Percentage Proven + Probable0%
Metal Value Percentage Measured + Indicated83%
Metal Value Percentage Inferred17%

The above metal value totals derive from the following projects.

Project/Deposit/Mine Summary Based on Closing Prices on 2013-05-24
Project Location Metal Value per
share (% total)
Average
Ore Value
US$/t
GoldPP%MI%I%
SalaveAsturias Region, Spain$76.36 ( 100.0% )US$129.002.02 M oz083%17%

 

Salave

Latest NI43-101 Report: PRELIMINARY ECONOMIC ASSESSMENT ON THE SALAVE GOLD PROJECT, ASTURIAS REGION, SPAIN
2011-02-12 (263 pages).

Project Location: Asturias Region, Spain.

Average Ore Value (all estimate types): US$129.00

Measured + Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$63.571.68 M oz2.920 g/t17.95 M t

Estimate notes: See Table EX 3: Mineral Resource Estimate, as of January 15, 2010 (Scott Wilson RPA) on p. 15 of 263 in the NI43-101 dated February, 2011.
0.7 g/t Au cut-off.

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$6.12162.17 K oz1.940 g/t2.60 M t

Estimate notes: Open pit.
0.7 g/t Au cut-off grade.

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$6.67176.80 K oz4.700 g/t1.17 M t

Estimate notes: Underground.
2.5 g/t Au cut-off grade.