GoldMinerPulse Report: Alexandria Minerals Corporation Metal Value



million_dollar_hand DriveDream wpt dollar

Alexandria Minerals Corporation (AZX) NI 43-101 Metal Value Report

The Alexandria Minerals Corporation web site is at www.azx.ca.

Information Links: Yahoo News and Quotes | Yahoo Message Board | StockCharts | Stockhouse | Canadian Insider Trading

More Information Links: Candlestick Analysis | 

Alexandria Minerals Valuation Blog (updated daily).

Recent Company Headlines

GoldMinerPulse Metrics Summary

This report is based on NI 43-101 resource and reserve disclosures and fully diluted share counts available on 2010-08-06.

The GoldMinerPulse metrics, presented below in table format, are based on all projects and all in situ metals and are updated daily with closing market prices.

Alexandria Minerals Corporation Metric Summary
General MetricValue on 2010-09-08
In Situ Metal Value per Share (MVpSh)US$5.37
Average Ore Value per TonneUS$52.05
Metal Value Leverage (MVL)27.56
Market Capitalization as a Percentage of Metal Value3.6%
Recent Closing Stock PriceC$0.205
[note 1]
Fully Diluted Share Count169.14 M
[note 2]
Percentage In Situ Proven + Probable Reserve0%
Percentage In Situ Measured + Indicated Resource53%
Percentage In Situ Inferred Resource47%
Gold Specific Metrics
MetricValue on 2010-09-08
Gold Reserves + Resources723.67 K oz
Average Gold Ore Grade1.3 g/t
Market Capitalization per oz of Gold In SituUS$45.57
( C$47.91 )
Gold Equivalent Ounces Estimate723.67 K oz
Market Capitalization per oz of Gold EquivalentUS$45.57
( C$47.91 )
 

GoldMinerPulse Most Optimistic Resource Estimate Summary (MORE)

All metal counts in this section are based on the combined Proven + Probable reserves plus the Measured + Indicated and Inferred resources.

Metal Summary Based on Closing Prices on 2010-09-08
Metric / MetalGold
Total Counts (reserves + resources)723.67 K oz
Metal Prices in US$ (from 2010-09-08)$1,255.80 per oz
Metal Value per Share (MVpSh)
Shown in US$. Based on fully diluted share count
$5.37
Percentage of Total Metal Value100.00%
Metal Value Percentage Proven + Probable0%
Metal Value Percentage Measured + Indicated53%
Metal Value Percentage Inferred47%

The above metal value totals derive from the following projects.

Project/Deposit/Mine Summary Based on Closing Prices on 2010-09-08
Project Location Metal Value per
share (% total)
GoldPP%MI%I%
OrenadaQuebec, Canada$4.26 ( 79.2% )573.49 K oz067%33%
SleepyQuebec, Canada$1.12 ( 20.8% )150.18 K oz00100%

 

Orenada

Latest NI43-101 Report: NI 43-101 TECHNICAL REPORT ON THE ORENADA PROPERTY
2009-08-14 (566 pages).

Updates: See the Management Discussion & Analysis filing for the period ending October 31, 2009.

Project Location: Quebec, Canada in the Abitibi Belt mining region. View the Orenada project on a Google Map.

Measured + Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$2.87386.25 K oz1.160 g/t10.36 M t

Estimate notes: See Table 5. Resource Estimate Summary - Tonnage and Grade Variation according to different cut-off grade on p. 49 of 566 in the NI 43-101 dated August 2009.
Cut-off grade was 0.30 g/t gold.

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$1.39187.24 K oz1.050 g/t5.55 M t

Estimate notes: See Measured + Indicated note.
Cut-off grade was 0.30 g/t gold.


 

Sleepy

Latest NI43-101 Report: NI 43-101 TECHNICAL REPORT ON THE SLEEPY PROPERTY
2009-12-04 (177 pages).

Updates: See the Management Discussion & Analysis filing for the period ending October 31, 2009.

Project Location: Quebec, Canada in the Abitibi Belt mining region. View the Sleepy project on a Google Map.

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$1.12150.18 K oz3.000 g/t1.56 M t

Estimate notes: See p. 25 of 177 in the NI 43-101 report dated December 2009.
Cut-off was 2.0 g/t Au

double dip bonus play texas holdem Sinatra_Dollar