GoldMinerPulse Report: Fortuna Silver Mines Inc. Metal Value

This page is now out of date. Please visit GoldMinerPulse Home Page to access current pages, which are now updated with daily market closing prices and sedar.com document filings.



Get Adobe Flash player Seabridgegold.net    

Fortuna Silver Mines Inc. (FVI) NI 43-101 Metal Value Report

The Fortuna Silver Mines Inc. website is at www.fortunasilver.com.

Information Links: Yahoo News and Quotes | StockCharts

More Information Links: Canadian Insider Trading | 

Check Fortuna Silver Lima Quotes (US$)

GoldMinerPulse Metrics Summary

This report is based on NI 43-101 resource and reserve disclosures and fully diluted share counts available on 2011-05-11.

The GoldMinerPulse metrics, presented below in table format, are based on all projects and all in situ metals and are updated daily with closing market prices.

Fortuna Silver Mines Inc. Metric Summary
General MetricValue on 2013-05-24
In Situ Metal Value per Share (MVpSh)US$26.01
Average Ore Value per TonneUS$199.38
Metal Value Leverage (MVL)-no stock price-
Market Capitalization as a Percentage of Metal Value - price unavailable
Recent Closing Stock PriceC$
[note 1]
Fully Diluted Share Count127.05 M
[note 2]
Percentage In Situ Proven + Probable Reserve26%
Percentage In Situ Measured + Indicated Resource36%
Percentage In Situ Inferred Resource38%
Silver Specific Metrics
MetricValue on 2013-05-24
Silver Reserves + Resources90.13 M oz
Average Silver Ore Grade169.1 g/t
Market Capitalization per oz of Silver In SituUS$0.00
( C$0.00 )
Silver Equivalent Ounces Estimate147.81 M oz
Market Capitalization per oz of Silver EquivalentUS$0.00
( C$0.00 )
 

GoldMinerPulse Most Optimistic Resource Estimate Summary (MORE)

All metal counts in this section are based on the combined Proven + Probable reserves plus the Measured + Indicated and Inferred resources.

Metal Summary Based on Closing Prices on 2013-05-24
Metric / MetalGoldSilverCopperLeadZinc
Total Counts (reserves + resources)499.26 K oz90.13 M oz 119.01 K t193.74 K t
Metal Prices in US$ (from 2013-05-24)$1,384.20 / oz$22.36 / oz$3.29 / lb$0.93810 / lb$0.82510 / lb
Metal Value per Share (MVpSh)
Shown in US$. Based on fully diluted share count
$5.44$15.86$0.00$1.94$2.77
Percentage of Total Metal Value20.91%60.98%0.00%7.45%10.66%
Metal Value Percentage Proven + Probable10%23%0%57%51%
Metal Value Percentage Measured + Indicated47%39%0%14%14%
Metal Value Percentage Inferred43%38%0%29%35%

The above metal value totals derive from the following projects.

Project/Deposit/Mine Summary Based on Closing Prices on 2013-05-24
Project Location Metal Value per
share (% total)
Average
Ore Value
US$/t
GoldSilverCopperLeadZincPP%MI%I%
CayllomaArequipa, Peru$13.02 ( 50.1% )US$176.82104.17 K oz40.76 M oz 119.01 K t193.74 K t51%17%32%
San JoseOaxaca, Mexico$12.99 ( 49.9% )US$228.61395.08 K oz49.37 M oz 055%45%

 

Caylloma

Latest NI43-101 Report: Technical Review (NI 43-101) Caylloma Project Peru
2009-08-12 (104 pages).

Updates: 2010 Annual Report.

Project Location: Arequipa, Peru. View the Fortuna Silver Mines Caylloma Peru property on a Google Map.

Average Ore Value (all estimate types): US$176.82

Proven + Probable

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$0.5247.87 K oz0.360 g/t4.14 M t
Silver$3.6320.61 M oz155.000 g/t4.14 M t
Lead$1.1067.42 K t  16,300.000 g/t4.14 M t
Zinc$1.4299.26 K t  24,000.000 g/t4.14 M t

Estimate notes: See Table 1-3 Diluted Mineable Ore Reserves at Caylloma as of 31 December 2008. on p. 10 of 105 in the NI 43-101 report dated August 2009.

Measured + Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$0.2018.81 K oz0.310 g/t1.89 M t
Silver$1.307.40 M oz122.000 g/t1.89 M t
Lead$0.2716.61 K t  8,800.000 g/t1.89 M t
Zinc$0.3927.17 K t  14,400.000 g/t1.89 M t

Estimate notes: See Proven + Probable note.

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$0.4137.49 K oz0.350 g/t3.33 M t
Silver$2.2412.75 M oz119.000 g/t3.33 M t
Lead$0.5734.99 K t  10,500.000 g/t3.33 M t
Zinc$0.9667.31 K t  20,200.000 g/t3.33 M t

Estimate notes: See Proven + Probable note.


 

San Jose

Latest NI43-101 Report: NI-43-101 TECHNICAL REPORT SAN JOSE SILVER PROJECT OAXACA, MEXICO
2010-06-09 (116 pages).

Updates: 2010 Annual Report.

Project Location: Oaxaca, Mexico. View project on a Google Map.

Average Ore Value (all estimate types): US$228.61

Measured + Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$2.09191.56 K oz1.580 g/t3.77 M t
Silver$4.3124.49 M oz202.000 g/t3.77 M t

Estimate notes: 2010 Annual Report.
Cutoff Grade of 150 g/t Equivalent Silver

Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$0.2825.63 K oz2.120 g/t376.00 K t
Silver$0.522.94 M oz243.000 g/t376.00 K t

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$1.94177.90 K oz1.800 g/t3.07 M t
Silver$3.8621.94 M oz222.000 g/t3.07 M t