GoldMinerPulse Report: Great Panther Silver Limited Metal Value



Seabridgegold.net    

Great Panther Silver Limited (GPR) NI 43-101 Metal Value Report

The Great Panther Silver Limited website is at www.greatpanther.com.

Information Links: Yahoo News and Quotes | StockCharts

GoldMinerPulse Metrics Summary

This report is based on NI 43-101 resource and reserve disclosures and fully diluted share counts available on 2011-11-17.

The GoldMinerPulse metrics, presented below in table format, are based on all projects and all in situ metals and are updated daily with closing market prices.

Great Panther Silver Limited Metric Summary
General MetricValue on 2012-02-03
In Situ Metal Value per Share (MVpSh)US$6.99
Average Ore Value per TonneUS$580.36
Metal Value Leverage (MVL)2.58
Market Capitalization as a Percentage of Metal Value38.7%
Recent Closing Stock PriceC$2.69
[note 1]
Fully Diluted Share Count139.27 M
[note 2]
Percentage In Situ Proven + Probable Reserve0%
Percentage In Situ Measured + Indicated Resource40%
Percentage In Situ Inferred Resource60%
Silver Specific Metrics
MetricValue on 2012-02-03
Silver Reserves + Resources19.60 M oz
Average Silver Ore Grade363.4 g/t
Market Capitalization per oz of Silver In SituUS$19.24
( C$19.11 )
Silver Equivalent Ounces Estimate28.96 M oz
Market Capitalization per oz of Silver EquivalentUS$13.03
( C$12.94 )
 

GoldMinerPulse Most Optimistic Resource Estimate Summary (MORE)

All metal counts in this section are based on the combined Proven + Probable reserves plus the Measured + Indicated and Inferred resources.

Metal Summary Based on Closing Prices on 2012-02-03
Metric / MetalGoldSilverLeadZinc
Total Counts (reserves + resources)119.71 K oz19.60 M oz31.40 K t18.02 K t
Metal Prices in US$ (from 2012-02-03)$1,725.90 / oz$33.63 / oz$1.00640 / lb$0.96490 / lb
Metal Value per Share (MVpSh)
Shown in US$. Based on fully diluted share count
$1.48$4.73$0.50$0.28
Percentage of Total Metal Value21.22%67.69%7.15%3.94%
Metal Value Percentage Proven + Probable0%0%0%0%
Metal Value Percentage Measured + Indicated30%43%41%41%
Metal Value Percentage Inferred70%57%59%59%

The above metal value totals derive from the following projects.

Project/Deposit/Mine Summary Based on Closing Prices on 2012-02-03
Project Location Metal Value per
share (% total)
Average
Ore Value
US$/t
GoldSilverLeadZincPP%MI%I%
TopiaDurango, Mexico$4.12 ( 58.9% )US$1,258.2122.32 K oz12.70 M oz31.40 K t18.02 K t038%62%
GuanajuatoGuanajuato, Mexico$1.77 ( 25.3% )US$403.7557.12 K oz4.40 M oz 069%31%
San IgnacioGuanajuato, Mexico$1.10 ( 15.8% )US$251.0740.27 K oz2.49 M oz 00100%

 

Guanajuato

Latest NI43-101 Report: Technical Report on the Guanajuato Mine
2011-01-31 (157 pages).

Updates: November, 2011 Corporate Presentation, slide 18 of 25.

Project Location: Guanajuato, Mexico. View Guanajuato Mines on a Google Map.

Average Ore Value (all estimate types): US$403.75

Measured + Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$0.3427.20 K oz2.120 g/t399.00 K t
Silver$0.893.68 M oz287.000 g/t399.00 K t

Estimate notes:

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$0.3729.92 K oz4.390 g/t212.00 K t
Silver$0.17722.49 K oz106.000 g/t212.00 K t

Estimate notes:


 

San Ignacio

Latest NI43-101 Report: TECHNICAL REPORT ON THE SAN IGNACIO PROJECT MINERAL RESOURCE GUANAJUATO, MEXICO
2011-09-20 (85 pages).

Updates: November, 2011 Corporate Presentation, slide 18 of 25.

Project Location: Guanajuato, Mexico.

Average Ore Value (all estimate types): US$251.07

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$0.5040.27 K oz2.050 g/t611.00 K t
Silver$0.602.49 M oz127.000 g/t611.00 K t

Estimate notes:


 

Topia

Latest NI43-101 Report: TECHNICAL REPORT ON THE TOPIA MINE, STATE OF DURANGO, MEXICO
2011-03-28 (57 pages).

Updates: November, 2011 Corporate Presentation, slide 18 of 25.

Project Location: Durango, Mexico in the Sierra Madre Occidental mining region. View the Topia Mine on a Google Map.

Average Ore Value (all estimate types): US$1,258.21

Measured + Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$0.118.58 K oz1.560 g/t171.00 K t
Silver$1.154.75 M oz864.000 g/t171.00 K t
Lead$0.2112.88 K t  75,300.000 g/t171.00 K t
Zinc$0.117.47 K t  43,700.000 g/t171.00 K t

Estimate notes:

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$0.1713.74 K oz1.500 g/t285.00 K t
Silver$1.927.95 M oz868.000 g/t285.00 K t
Lead$0.3018.53 K t  65,000.000 g/t285.00 K t
Zinc$0.1610.55 K t  37,000.000 g/t285.00 K t

Estimate notes: See notes for Measured + Indicated above.

  Banner ad GoldMinerPulse.    

Web site design by SEO-upgrades.