GoldMinerPulse Report: Hecla Mining Company Metal Value



Get Adobe Flash player Seabridgegold.net    

Hecla Mining Company (HL) NI 43-101 Metal Value Report

In 2010, Hecla was the lowest-cost primary silver producer in the U.S., producing 10.6 million ounces of silver at an average total cash cost per ounce of negative $1.46. Hecla has proven operating expertise and highly prospective exploration opportunities where it operates in the U.S., as well as within its development projects in Colorado and Mexico. [Source: Hecla Profile webpage (viwed May 2011)]

The Hecla Mining Company website is at www.hecla-mining.com.

Information Links: Yahoo News and Quotes | Yahoo Message Board | StockCharts

GoldMinerPulse Metrics Summary

This report is based on NI 43-101 resource and reserve disclosures and fully diluted share counts available on 2011-05-30.

The GoldMinerPulse metrics, presented below in table format, are based on all projects and all in situ metals and are updated daily with closing market prices.

Hecla Mining Company Metric Summary
General MetricValue on 2012-05-17
In Situ Metal Value per Share (MVpSh)US$60.06
Average Ore Value per TonneUS$489.04
Metal Value Leverage (MVL)15.45
Market Capitalization as a Percentage of Metal Value6.5%
Recent Closing Stock PriceC$3.96
[note 1]
Fully Diluted Share Count304.00 M
[note 2]
Percentage In Situ Proven + Probable Reserve42%
Percentage In Situ Measured + Indicated Resource26%
Percentage In Situ Inferred Resource32%
Silver Specific Metrics
MetricValue on 2012-05-17
Silver Reserves + Resources389.73 M oz
Average Silver Ore Grade326.6 g/t
Market Capitalization per oz of Silver In SituUS$3.03
( C$3.09 )
Silver Equivalent Ounces Estimate650.69 M oz
Market Capitalization per oz of Silver EquivalentUS$1.82
( C$1.85 )
 

GoldMinerPulse Most Optimistic Resource Estimate Summary (MORE)

All metal counts in this section are based on the combined Proven + Probable reserves plus the Measured + Indicated and Inferred resources.

Metal Summary Based on Closing Prices on 2012-05-17
Metric / MetalGoldSilverLeadZinc
Total Counts (reserves + resources)851.56 K oz389.73 M oz1.59 M t1.53 M t
Metal Prices in US$ (from 2012-05-17)$1,574.10 / oz$28.06 / oz$0.87480 / lb$0.86110 / lb
Metal Value per Share (MVpSh)
Shown in US$. Based on fully diluted share count
$4.41$35.97$10.11$9.57
Percentage of Total Metal Value7.34%59.90%16.83%15.93%
Metal Value Percentage Proven + Probable89%36%32%51%
Metal Value Percentage Measured + Indicated6%27%38%20%
Metal Value Percentage Inferred5%37%31%29%

The above metal value totals derive from the following projects.

Project/Deposit/Mine Summary Based on Closing Prices on 2012-05-17
Project Location Metal Value per
share (% total)
Average
Ore Value
US$/t
GoldSilverLeadZincPP%MI%I%
Lucky FridayIdaho, USA$28.61 ( 47.6% )US$400.23 199.34 M oz1.15 M t465.77 K t21%51%28%
Green CreekAlaska, USA$26.87 ( 44.7% )US$673.23851.56 K oz154.23 M oz362.74 K t949.06 K t71%3%26%
San Juan SilverColorado, USA$2.77 ( 4.6% )US$428.64 25.98 M oz33.39 K t25.53 K t00100%
San Sebastian HughDurango, Mexico$1.32 ( 2.2% )US$386.91 9.14 M oz30.06 K t45.60 K t00100%
NoondayIdaho, USA$0.49 ( 0.8% )US$317.33 1.04 M oz16.91 K t46.04 K t00100%

 

Green Creek

The 100%-owned Greens Creek silver, gold, lead, and zinc underground mining operation is located in Southeast Alaska. Since 2008, when the company acquired Rio Tinto's remaining 70% interest in the operation, Hecla nearly doubled its silver reserves and metals production. In the first quarter of 2011, Greens Creek produced 1.7 million ounces of silver with an average ore grade of 12.5 ounces of silver per ton. Greens Creek is one of the world's largest high-grade, low-cost silver mines, with more than 200 million ounces produced in the last 20 years. [Source: Investor Fact Sheet, May 2011]

Latest NI43-101 Report:
( pages).

Updates: Production and Reserves webpage (viewed May 2011).

Project Location: Alaska, USA.

Average Ore Value (all estimate types): US$673.23

Probable

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$3.93758.37 K oz3.154 g/t7.48 M t
Silver$9.2199.74 M oz414.857 g/t7.48 M t
Lead$1.66261.73 K t  35,000.000 g/t7.48 M t
Zinc$4.34695.46 K t  93,000.000 g/t7.48 M t

Estimate notes:

Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$0.2649.76 K oz2.160 g/t716.49 K t
Silver$0.303.24 M oz140.571 g/t716.49 K t
Lead$0.0914.33 K t  20,000.000 g/t716.49 K t
Zinc$0.2132.96 K t  46,000.000 g/t716.49 K t

Estimate notes:

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$0.2243.43 K oz0.343 g/t3.94 M t
Silver$4.7351.25 M oz404.571 g/t3.94 M t
Lead$0.5586.68 K t  22,000.000 g/t3.94 M t
Zinc$1.38220.65 K t  56,000.000 g/t3.94 M t

Estimate notes:


 

Lucky Friday

The Lucky Friday silver mine is located in one of the world's most prolific silver-producing districts: northern Idaho's Silver Valley. It is the deepest operating mine in the United States and has been in commercial production since 1942. Over the past 69 years, 147 million ounces of silver have been mined. Construction of the #4 Shaft project continues with the hoist room equipment installation and completion of detailed engineering and its components in the second quarter 2011. Completion of the #4 Shaft project is expected in H2/2014 with potential to increase production by 60% to 5 million ounces of silver annually. [Source: Investor Fact Sheet, May 2011]

Latest NI43-101 Report:
( pages).

Updates: Production and Reserves webpage (viewed May 2011).

Project Location: Idaho, USA.

Average Ore Value (all estimate types): US$400.23

Proven

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Silver$1.8820.36 M oz425.143 g/t1.49 M t
Lead$0.74116.20 K t  78,000.000 g/t1.49 M t
Zinc$0.2641.71 K t  28,000.000 g/t1.49 M t

Estimate notes:

Probable

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Silver$2.0321.94 M oz486.857 g/t1.40 M t
Lead$0.79124.75 K t  89,000.000 g/t1.40 M t
Zinc$0.2642.05 K t  30,000.000 g/t1.40 M t

Estimate notes:

Measured + Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Silver$9.27100.41 M oz229.714 g/t13.60 M t
Lead$3.71584.63 K t  43,000.000 g/t13.60 M t
Zinc$1.70271.92 K t  20,000.000 g/t13.60 M t

Estimate notes:

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Silver$5.2356.63 M oz336.000 g/t5.24 M t
Lead$2.06325.00 K t  62,000.000 g/t5.24 M t
Zinc$0.69110.08 K t  21,000.000 g/t5.24 M t

Estimate notes:


 

Noonday

[Source: Production and Reserves webpage (viewed May 2011)]

Latest NI43-101 Report:
( pages).

Updates: Production and Reserves webpage (viewed May 2011).

Project Location: Idaho, USA.

Average Ore Value (all estimate types): US$317.33

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Silver$0.101.04 M oz68.571 g/t469.83 K t
Lead$0.1116.91 K t  36,000.000 g/t469.83 K t
Zinc$0.2946.04 K t  98,000.000 g/t469.83 K t

Estimate notes:


 

San Juan Silver

In 2008, Hecla acquired the right to earn into a 70% joint-venture interest in a roughly 23-square-mile consolidated land package in one of Colorado's most prolific silver-producing districts. The exploration property has an identified resource of approximately 26 million ounces of silver, with potential for more resources through a targeted exploration program. A scoping study is under way to look at potentially reopening the Bulldog mine. [Source: Investor Fact Sheet, May 2011]

Latest NI43-101 Report:
( pages).

Updates: Production and Reserves webpage (viewed May 2011).

Project Location: Colorado, USA.

Average Ore Value (all estimate types): US$428.64

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Silver$2.4025.98 M oz411.429 g/t2.81 M t
Lead$0.2133.39 K t  17,000.000 g/t2.81 M t
Zinc$0.1625.53 K t  13,000.000 g/t2.81 M t

Estimate notes:
Resource quantities adjusted for ownership percentage of 70.0%.


 

San Sebastian Hugh

The San Sebastian mine is located approximately 56 miles northeast of the city of Durango, Mexico. Hecla is engaged in an exploration program on this 300-square-mile property, which is on trend with major mines and deposits in central Mexico. A scoping study is underway to look at potentially re-opening the Hugh zone. [Source: Investor Fact Sheet, May 2011]

Latest NI43-101 Report:
( pages).

Updates: Production and Reserves webpage (viewed May 2011).

Project Location: Durango, Mexico.

Average Ore Value (all estimate types): US$386.91

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Silver$0.849.14 M oz274.286 g/t1.04 M t
Lead$0.1930.06 K t  29,000.000 g/t1.04 M t
Zinc$0.2845.60 K t  44,000.000 g/t1.04 M t

Estimate notes:

Web site design by SEO-upgrades.