| |
![]() |
Caution: This New Gold report is prepared assuming the Richfield Venture completes per the April 4, 2011 news release.
The New Gold Inc. website is at newgold.com.
Information Links: Yahoo News and Quotes | Yahoo Message Board | StockCharts
More Information Links: Knobias | Canadian Insider Trading
This report is based on NI 43-101 resource and reserve disclosures and fully diluted share counts available on 2011-09-16.
The GoldMinerPulse metrics, presented below in table format, are based on all projects and all in situ metals and are updated daily with closing market prices.
| General Metric | Value on 2012-02-03 |
|---|---|
| In Situ Metal Value per Share (MVpSh) | US$140.12 |
| Average Ore Value per Tonne | US$50.47 |
| Metal Value Leverage (MVL) | 11.68 |
| Market Capitalization as a Percentage of Metal Value | 8.6% |
| Recent Closing Stock Price | C$11.92 [note 1] |
| Fully Diluted Share Count | 460.08 M [note 2] |
| Percentage In Situ Proven + Probable Reserve | 0% |
| Percentage In Situ Measured + Indicated Resource | 74% |
| Percentage In Situ Inferred Resource | 26% |
| Metric | Value on 2012-02-03 |
|---|---|
| Gold Reserves + Resources | 23.60 M oz |
| Average Gold Ore Grade | 0.6 g/t |
| Market Capitalization per oz of Gold In Situ | US$233.97 ( C$232.38 ) |
| Gold Equivalent Ounces Estimate | 37.35 M oz |
| Market Capitalization per oz of Gold Equivalent | US$147.82 ( C$146.82 ) |
Note 1: Conversion rate used: 1 Cnd$ = 1.00682 US$
Note 2: Fully diluted share count estimate based on June 30, 2011 financial statements.
All metal counts in this section are based on the combined Proven + Probable reserves plus the Measured + Indicated and Inferred resources.
| Metric / Metal | Gold | Silver | Copper | ||
|---|---|---|---|---|---|
| Total Counts (reserves + resources) | 23.60 M oz | 216.33 M oz | 1.92 M t | ||
| Metal Prices in US$ (from 2012-02-03) | $1,725.90 / oz | $33.63 / oz | $3.89 / lb | ||
| Metal Value per Share (MVpSh) Shown in US$. Based on fully diluted share count | $88.53 | $15.81 | $35.78 | ||
| Percentage of Total Metal Value | 63.18% | 11.29% | 25.53% | ||
| Metal Value Percentage Proven + Probable | 0% | 0% | 0% | ||
| Metal Value Percentage Measured + Indicated | 72% | 50% | 87% | ||
| Metal Value Percentage Inferred | 28% | 50% | 13% | ||
The above metal value totals derive from the following projects.
| Project | Location | Metal Value per share (% total) | Average Ore Value US$/t | Gold | Silver | Copper | PP% | MI% | I% |
|---|---|---|---|---|---|---|---|---|---|
| Cerro San Pedro Mine | State of San Luis Potosi, Mexico | $37.83 ( 27.0% ) | US$35.28 | 6.60 M oz | 178.84 M oz | 0 | 37% | 63% | |
| El Morro | Region III, Chile | $28.67 ( 20.5% ) | US$70.82 | 2.75 M oz | 984.95 K t | 0 | 94% | 6% | |
| New Afton | British Columbia, Canada | $24.46 ( 17.5% ) | US$124.78 | 2.11 M oz | 6.64 M oz | 861.82 K t | 0 | 80% | 20% |
| Blackwater | British Columbia, Canada | $23.75 ( 17.0% ) | US$60.76 | 5.76 M oz | 29.16 M oz | 0 | 82% | 18% | |
| Mesquite | California, USA | $19.61 ( 14.0% ) | US$28.22 | 5.23 M oz | 0 | 93% | 7% | ||
| Peak Gold Mines | New South Wales, Australia | $5.80 ( 4.1% ) | US$330.86 | 1.15 M oz | 1.69 M oz | 72.63 K t | 0 | 75% | 25% |
| Amapari Mine | Amapa State, Brazil | $0.00 ( 0.0% ) | 0 | 0 | 0 |
PP%: percentage of metal value from Proven + Probable reserves
MI%: percentage of metal value from Measured + Indicated resources
I%: percentage of metal value from Inferred resources
Note: percentages may no add to 100% due to rounding errors
Latest NI43-101 Report: Readdressed Technical Report Amapari Mine Amapa, Brazil
2008-05-26 (186 pages).
Updates: New Gold Reserves and Resources Press Release, January 25, 2010.
Project Location: Amapa State, Brazil. View project on a Google Map.
The Blackwater Project is a bulk-tonnage gold project located in central British Columbia and is approximately 450 kilometres north of New Gold’s New Afton Project. The project area covers 23,670 hectares, with Richfield owning 100% of the southern claims and 75% of the adjacent northern claims. Silver Quest Resources Ltd. owns the remaining 25% of the northern Davidson claims. [Source: April 4, 2011 News Release]
Latest NI43-101 Report: TECHNICAL REPORT
BLACKWATER GOLD PROJECT
Omineca Mining Division
British Columbia, Canada
2011-11-02 (79 pages).
Project Location: British Columbia, Canada.
Average Ore Value (all estimate types): US$60.76
Indicated
| Metal | MVpSh | Contained Metal Quantity | Ore Grade | Ore Quantity |
|---|---|---|---|---|
| Gold | $17.74 | 4.73 M oz | 1.010 g/t | 165.16 M t |
| Silver | $1.75 | 23.88 M oz | 5.100 g/t | 165.16 M t |
Estimate notes:
Resource quantities adjusted for ownership percentage of 88.2%.
0.4 g/t Au Cut-off grade.
Inferred
| Metal | MVpSh | Contained Metal Quantity | Ore Grade | Ore Quantity |
|---|---|---|---|---|
| Gold | $3.88 | 1.03 M oz | 0.940 g/t | 38.76 M t |
| Silver | $0.39 | 5.28 M oz | 4.800 g/t | 38.76 M t |
Estimate notes:
Resource quantities adjusted for ownership percentage of 88.2%.
Latest NI43-101 Report: 2007 Mineral Reserve Update Cerro San Pedro Project State of San Luis Potosi, Mexico
2007-03-31 (79 pages).
Updates: New Gold Reserves and Resources Press Release, January 25, 2010..
Project Location: State of San Luis Potosi, Mexico. View project on a Google Map.
Average Ore Value (all estimate types): US$35.28
Measured + Indicated
| Metal | MVpSh | Contained Metal Quantity | Ore Grade | Ore Quantity |
|---|---|---|---|---|
| Gold | $5.11 | 1.36 M oz | 0.460 g/t | 92.12 M t |
| Silver | $3.76 | 51.47 M oz | 17.380 g/t | 92.12 M t |
Estimate notes: Oxides, inclusive of Proven and Probable.
Measured + Indicated
| Metal | MVpSh | Contained Metal Quantity | Ore Grade | Ore Quantity |
|---|---|---|---|---|
| Gold | $3.39 | 902.83 K oz | 0.460 g/t | 61.05 M t |
| Silver | $1.93 | 26.34 M oz | 13.420 g/t | 61.05 M t |
| Lead | $0.44 | 91.57 K t | 1,500.000 g/t | 61.05 M t |
| Zinc | $2.09 | 451.74 K t | 7,400.000 g/t | 61.05 M t |
Estimate notes: Sulphides also see Measured + Indicated above.
Inferred
| Metal | MVpSh | Contained Metal Quantity | Ore Grade | Ore Quantity |
|---|---|---|---|---|
| Gold | $0.63 | 167.18 K oz | 0.290 g/t | 17.93 M t |
| Silver | $0.41 | 5.59 M oz | 9.690 g/t | 17.93 M t |
Estimate notes: Oxides, inside Mineral Resources Pit - also see Measured + Indicated above.
Inferred
| Metal | MVpSh | Contained Metal Quantity | Ore Grade | Ore Quantity |
|---|---|---|---|---|
| Gold | $0.83 | 222.42 K oz | 0.330 g/t | 20.96 M t |
| Silver | $0.42 | 5.76 M oz | 8.540 g/t | 20.96 M t |
| Lead | $0.05 | 10.48 K t | 500.000 g/t | 20.96 M t |
| Zinc | $0.12 | 25.58 K t | 1,220.000 g/t | 20.96 M t |
Estimate notes: Sulphides, inside Mineral Resources Pit - also see Measured + Indicated above.
Inferred
| Metal | MVpSh | Contained Metal Quantity | Ore Grade | Ore Quantity |
|---|---|---|---|---|
| Gold | $2.80 | 747.47 K oz | 0.270 g/t | 86.11 M t |
| Silver | $1.39 | 19.05 M oz | 6.880 g/t | 86.11 M t |
Estimate notes: Oxides, outside Mineral Resources Pit - also see Measured + Indicated above.
Inferred
| Metal | MVpSh | Contained Metal Quantity | Ore Grade | Ore Quantity |
|---|---|---|---|---|
| Gold | $10.93 | 2.91 M oz | 0.430 g/t | 210.67 M t |
| Silver | $3.96 | 54.19 M oz | 8.000 g/t | 210.67 M t |
| Lead | $0.71 | 147.47 K t | 700.000 g/t | 210.67 M t |
| Zinc | $4.38 | 948.01 K t | 4,500.000 g/t | 210.67 M t |
Estimate notes: Sulphides, outside Mineral Resources Pit - also see Measured + Indicated above.
Inferred
| Metal | MVpSh | Contained Metal Quantity | Ore Grade | Ore Quantity |
|---|---|---|---|---|
| Gold | $1.07 | 284.55 K oz | 1.980 g/t | 4.47 M t |
| Silver | $1.20 | 16.46 M oz | 114.500 g/t | 4.47 M t |
| Lead | $0.35 | 71.97 K t | 16,100.000 g/t | 4.47 M t |
| Zinc | $1.28 | 275.80 K t | 61,700.000 g/t | 4.47 M t |
Estimate notes: Manto Sulphides - also see Measured + Indicated above.
Latest NI43-101 Report: Feasibility NI 43-101 Technical Report for the El Morro Copper-Gold Project, Region III, Chile
2008-05-09 (136 pages).
Updates: New Gold Reserves and Resources Press Release, January 25, 2010.
Project Location: Region III, Chile. View project on a Google Map.
Average Ore Value (all estimate types): US$70.82
Measured + Indicated
| Metal | MVpSh | Contained Metal Quantity | Ore Grade | Ore Quantity |
|---|---|---|---|---|
| Gold | $9.90 | 2.64 M oz | 0.490 g/t | 558.41 M t |
| Copper | $17.17 | 921.37 K t | 5,500.000 g/t | 558.41 M t |
Estimate notes: Measured + Indicated are inclusive of Proven + Probable.
See New Gold Reserves and Resources Press Release, January 25, 2010.
Resource quantities adjusted for ownership percentage of 30.0%.
Inferred
| Metal | MVpSh | Contained Metal Quantity | Ore Grade | Ore Quantity |
|---|---|---|---|---|
| Gold | $0.41 | 108.22 K oz | 0.180 g/t | 62.34 M t |
| Copper | $1.19 | 63.58 K t | 3,400.000 g/t | 62.34 M t |
Estimate notes: See Measured + Indicated above.
Resource quantities adjusted for ownership percentage of 30.0%.
Latest NI43-101 Report: TECHNICAL REPORT ON THE
MESQUITE MINE EXPANSION
FEASIBILITY STUDY,
IMPERIAL COUNTY, CALIFORNIA.
2009-08-25 (99 pages).
Updates: New Gold Press Release January 25, 2010.
Project Location: California, USA. View the Mesquite gold open pit mine on a Google Map.
Average Ore Value (all estimate types): US$28.22
Measured + Indicated
| Metal | MVpSh | Contained Metal Quantity | Ore Grade | Ore Quantity |
|---|---|---|---|---|
| Gold | $18.26 | 4.87 M oz | 0.510 g/t | 296.94 M t |
Estimate notes: New Gold Press Release January 25, 2010. Measured + Indicated are inclusive of Proven + Probable.
Inferred
| Metal | MVpSh | Contained Metal Quantity | Ore Grade | Ore Quantity |
|---|---|---|---|---|
| Gold | $1.35 | 359.25 K oz | 0.490 g/t | 22.80 M t |
Estimate notes: See Measured + Indicated notes.
Latest NI43-101 Report: TECHNICAL REPORT ON THE
NEW AFTON PROJECT,
BRITISH COLUMBIA, CANADA
2009-12-31 (194 pages).
Updates: New Gold Reserves and Resources Press Release, January 25, 2010.
Project Location: British Columbia, Canada. View project on a Google Map.
Average Ore Value (all estimate types): US$124.78
Measured + Indicated
| Metal | MVpSh | Contained Metal Quantity | Ore Grade | Ore Quantity |
|---|---|---|---|---|
| Gold | $6.27 | 1.67 M oz | 0.800 g/t | 65.00 M t |
| Silver | $0.38 | 5.27 M oz | 2.520 g/t | 65.00 M t |
| Copper | $12.96 | 695.50 K t | 10,700.000 g/t | 65.00 M t |
Estimate notes: Measured + Indicated contain some Probable. Probable are not reported exclusive of Measured + Indicated are therefore included in this count.
See New Gold Reserves and Resources Press Release, January 25, 2010.
Mineral Reserve estimates for the New Afton Project were calculated using a gold price of $475 per ounce and a copper price of $1.45 per pound. Cut-off at $15 per tonne of ore.
Inferred
| Metal | MVpSh | Contained Metal Quantity | Ore Grade | Ore Quantity |
|---|---|---|---|---|
| Gold | $1.64 | 437.51 K oz | 0.540 g/t | 25.20 M t |
| Silver | $0.10 | 1.38 M oz | 1.700 g/t | 25.20 M t |
| Copper | $3.10 | 166.32 K t | 6,600.000 g/t | 25.20 M t |
Estimate notes: See Measured + Indicated notes above.
Latest NI43-101 Report: Technical Report on Peak Gold Mines, New South Wales, Australia
2009-01-01 (342 pages).
Updates: New Gold Reserves and Resources Press Relase, January 25, 2010.
Project Location: New South Wales, Australia. View project on a Google Map.
Average Ore Value (all estimate types): US$330.86
Measured + Indicated
| Metal | MVpSh | Contained Metal Quantity | Ore Grade | Ore Quantity |
|---|---|---|---|---|
| Gold | $3.19 | 850.46 K oz | 4.360 g/t | 6.07 M t |
| Silver | $0.10 | 1.37 M oz | 7.000 g/t | 6.07 M t |
| Copper | $1.07 | 57.64 K t | 9,500.000 g/t | 6.07 M t |
Estimate notes: Grade adjusted to align contained gold quantity with web page. Measured + Indicated contains Proven + Probable.
Tonnes and grade of Mineral Reserves are stated on the basis of delivery to plant.
Inferred
| Metal | MVpSh | Contained Metal Quantity | Ore Grade | Ore Quantity |
|---|---|---|---|---|
| Gold | $1.13 | 302.07 K oz | 4.700 g/t | 2.00 M t |
| Silver | $0.02 | 321.35 K oz | 5.000 g/t | 2.00 M t |
| Copper | $0.28 | 14.99 K t | 7,500.000 g/t | 2.00 M t |
Estimate notes: See Measured + Indicated notes above.
| Banner ad GoldMinerPulse. |