|
||||||||||||||||||
|
![]() |
![]() |
Company Web Site: www.orkosilver.com
(NI) 43-101 reports from projects located in: Mexico (MX)
This report is based on NI 43-101 disclosures and fully diluted share counts available on: 2009-10-17. Metrics have been updated with stock price and metal prices in effect at the close of Canadian markets on 2010-03-10.
External Links: Yahoo News and Quotes | StockCharts | StockHouse
More External Links: Knobias | Pan American Silver, La Preciosa JV Partner |
Canadian Insider Trading |
Orko Silver Valuation and Orko Silver Relationship to "Sister" Company Orex Minerals |
Orko Silver FAQ (October 2009) |
September 08, 2009 Delineation Drilling by Pan American Confirms Orko Results
32.7 metres of 267.9 g/t Ag Eq Silver Intercepted :
Of particular note in the PAA drilling is a thick, high-grade intercept of the Martha Vein in hole BP09-374. This hole yielded a true thickness of 32.68 metres grading 0.376 g/t gold and 245.4 g/t silver for a silver-equivalent of 267.9 g/t. Within this intercept is 3.50 metres grading 2.185 g/t gold and 1,017.7 g/t silver for a silver-equivalent of 1,148.9 g/t.GoldMinerPulse Most Optimistic Resource Estimate Summary (MORE):
Metrics last with prices in effect at the TSX/TSXV close on 2010-03-10
Project/Deposit CC MVpSh PP% MI% I% Gold Silver La Preciosa MX $8.54 0 47% 53% 85.27 K oz 60.82 M oz GoldMinerPulse Metrics - Total All Projects/Deposits by Metal, prices from 2010-Mar-10 Metric / Metal Gold Silver Metal Totals 85.27 K oz 60.82 M oz Metal Prices in US$ (from 2010-03-10) $1,107.10 per oz $16.99 per oz Metal Value per Share (MVpSh)
(Shown in US$ and based on fully diluted share count shown below)$0.71 $7.82 Percentage of Total Metal Value 8.37% 91.63% PP% | MI% | I% 0 | 49% | 51% 0 | 47% | 53% GoldMinerPulse Metrics - All Metals from All Projects/Deposits and Prices from 2010-Mar-10 Metal Value per Share (MVpSh) US$8.54 Average Ore Value per Tonne US$110.29 Metal Value Leverage (MVL) 6.04 Market Capitalization as % of Metal Value 16.6% Recent Stock Price C$1.45 (TSX/TSXV close on 2010-03-10.)
Conversion rate used: 1 Cnd$ = 0.974756 US$ )Fully Diluted Share Count 132.12 M ( Fully diluted share count is from slide 3 of 31 in the company's May 2009 Presentation (viewed October 2009). ) PP% | MI% | I% 0 | 47% | 53% Silver Metrics-- all Projects/Deposits Average Silver Ore Grade 185 g/t Market Capitalization
per oz of Silver In Ground$3.07 US$ | 3.15 C$ Silver Eq Oz Estimate 66.38 M oz ( 60.82 M oz are in ground) Market Capitalization
per oz of Silver Equilavent$2.81 US$ | 2.89 C$ See terms for more about GoldMinerPulse metrics. Additional Notes:
Orko Silver Corp and Pan American Silver Joint Venture
The valuations of Orko Silver and Pan American Silver are prepared anticipating that the joint venture is completed. The Pan American Silver Deal, slide 22 of 31, Orko Presentation May 2009:
On April 14, 2009 Orko Silver and Pan American Silver Corp. jointly announce the formation of a Joint Venture (JV) to jointly announce the formation of a Joint Venture (JV) to advance the La Preciosa project into production
Pan American and Orko have agreed to form a joint venture to develop the La Preciosa project. Pan American will contribute its demonstrated mine development expertise, as well as 100% of the funds necessary to develop and construct an operating mine, in consideration for a 55% interest in the joint venture, while Orko will contribute its exploration expertise and the La Preciosa project and related concessions to retain a 45% interest. [emphasis added]
Over the next 36 months, Pan American has agreed to spend an estimated US$16 million at La Preciosa to conduct resource definition drilling, acquire necessary surface rights, obtain permits, and ultimately prepare and deliver a feasibility study to maintain its interest in the Joint Venture. Furthermore, Pan American has agreed to spend a minimum of US$5.0 million in the first 12 months of the development program to maintain its interest in the Joint Venture, of which a minimum of US$2.5 million will be spent to continue to explore the highly prospective land package that Orko is contributing to the Joint Venture. [emphasis added]Orko Silver Corp Peer Group Comparison - Orko Silver Corp.'s presentation (Oct 1/08).
Slide 18 of 25 lists Endeavour Silver (EDR), MAG Silver (MAG), Scorpio Mining (SPM), Great Panther and Fortuna Silver (FVI) as a peer group for comparisons.
Orko Silver Corp. and peer groupGoldMinerPulse Coverage Status:
- GoldMinerPulse coverage of Orko Silver Corp. is complete pending a final internal review.
(NI) 43-101 Report:
Title: Technical Report on the La Preciosa Project, Durango State, Mexico
Date: 2009-03-31 (203 pages)
Updates: Valuation report has been updated based on the April 14, 2009 News Release Pan American Silver And Orko Silver To Jointly Develop The "La Preciosa" Silver Project.
Project Location: Durango, Mexico / Mining Region: Sierra Madre Occidental
Map View: View the La Preciosa deposit on a Google Map.
Most Optimistic Resource Estimates (MORE):
•Indicated•Inferred
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $0.35 41.55 K oz 0.270 g/t 10.64 M t Silver $3.66 28.47 M oz 185.000 g/t 10.64 M t Estimate notes: See Table 1.1 Summary of La Preciosa Silver and Gold Resources on p. 12 of 203 in the (NI) 43-101 report dated March 31, 2009.
Resource quantities adjusted for ownership percentage of 45.0%.
100 g/t of Ag equivalent cut off
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $0.37 43.72 K oz 0.250 g/t 12.09 M t Silver $4.16 32.35 M oz 185.000 g/t 12.09 M t Estimate notes: See notes for Indicated above.
Resource quantities adjusted for ownership percentage of 45.0%.
![]() |
![]() |
![]() |
![]() |
|
| PartyCasino is the online casino operated by PartyGaming Plc. PartyGaming Plc is listed on the London Stock Exchange and is part of the FTSE 250 in the Travel & Leisure sector. | ||||