GoldMinerPulse Report: Aura Minerals Inc. Metal Value



Seabridgegold.net    

Aura Minerals Inc. (ORA) NI 43-101 Metal Value Report

The Aura Minerals Inc. website is at www.auraminerals.com.

Information Links: Yahoo News and Quotes | Yahoo Message Board | StockCharts | Canadian Insider Trading

GoldMinerPulse Metrics Summary

This report is based on NI 43-101 resource and reserve disclosures and fully diluted share counts available on 2011-11-12.

The GoldMinerPulse metrics, presented below in table format, are based on all projects and all in situ metals and are updated daily with closing market prices.

Aura Minerals Inc. Metric Summary
General MetricValue on 2012-02-03
In Situ Metal Value per Share (MVpSh)US$121.38
Average Ore Value per TonneUS$67.61
Metal Value Leverage (MVL)98.82
Market Capitalization as a Percentage of Metal Value1.0%
Recent Closing Stock PriceC$1.22
[note 1]
Fully Diluted Share Count242.48 M
[note 2]
Percentage In Situ Proven + Probable Reserve0%
Percentage In Situ Measured + Indicated Resource83%
Percentage In Situ Inferred Resource17%
Gold Specific Metrics
MetricValue on 2012-02-03
Gold Reserves + Resources4.48 M oz
Average Gold Ore Grade0.3 g/t
Market Capitalization per oz of Gold In SituUS$66.48
( C$66.03 )
Gold Equivalent Ounces Estimate17.05 M oz
Market Capitalization per oz of Gold EquivalentUS$17.46
( C$17.35 )
 

GoldMinerPulse Most Optimistic Resource Estimate Summary (MORE)

All metal counts in this section are based on the combined Proven + Probable reserves plus the Measured + Indicated and Inferred resources.

Metal Summary Based on Closing Prices on 2012-02-03
Metric / MetalGoldSilverCopperIron
Total Counts (reserves + resources)4.48 M oz13.57 M oz1.53 M t36.83 M t
Metal Prices in US$ (from 2012-02-03)$1,725.90 / oz$33.63 / oz$3.89 / lb$200.00 / ton
Metal Value per Share (MVpSh)
Shown in US$. Based on fully diluted share count
$31.89$1.88$54.13$33.48
Percentage of Total Metal Value26.27%1.55%44.59%27.59%
Metal Value Percentage Proven + Probable0%0%0%0%
Metal Value Percentage Measured + Indicated79%76%83%86%
Metal Value Percentage Inferred21%24%17%14%

The above metal value totals derive from the following projects.

Project/Deposit/Mine Summary Based on Closing Prices on 2012-02-03
Project Location Metal Value per
share (% total)
Average
Ore Value
US$/t
GoldSilverCopperIronPP%MI%I%
ArapiracaAlagoas, Brazil$80.38 ( 66.2% )US$81.43712.64 K oz 1.18 M t36.83 M t085%15%
San AndresLa Union, Honduras$19.62 ( 16.2% )US$30.672.76 M oz 074%26%
AranzazuZacatecas, Mexico$17.72 ( 14.6% )US$182.24496.80 K oz13.57 M oz347.86 K t 077%23%
Sao FranciscoMato Grosso, Brazil$2.38 ( 2.0% )US$52.51334.88 K oz 0100%0
Sao VicenteMato Grosso, Brazil$1.27 ( 1.0% )US$49.33178.97 K oz 098%2%

 

Aranzazu

Latest NI43-101 Report: NI 43-101 TECHNICAL REPORT AND AUDIT OF THE PRELIMINARY RESOURCE ESTIMATE ON THE ARANZAZU PROPERTY ZACATECAS STATE, MEXICO
2008-07-15 (113 pages).

Updates: Aranzazu Reserves and Resources webpage (viewed November 2011).

Project Location: Zacatecas, Mexico.

Average Ore Value (all estimate types): US$182.24

Measured + Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$2.77388.50 K oz0.680 g/t17.77 M t
Silver$1.4210.27 M oz17.980 g/t17.77 M t
Copper$9.43266.55 K t  15,000.000 g/t17.77 M t

Estimate notes:

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$0.77108.30 K oz0.580 g/t5.81 M t
Silver$0.463.29 M oz17.640 g/t5.81 M t
Copper$2.8881.31 K t  14,000.000 g/t5.81 M t

Estimate notes:


 

Arapiraca

Latest NI43-101 Report: MINERAL RESOURCE UPDATE SERROTE DA LAJE AND CABOCLO DEPOSITS OF THE ARAPIRACA COPPER-GOLD-IRON ORE PROJECT State of Alagoas Brazil
2009-04-09 (109 pages).

Updates: Arapiraca Reserves and Resources webpage (viewed November, 2011).

Project Location: Alagoas, Brazil. View the Arapiraca project on a Google Map.

Average Ore Value (all estimate types): US$81.43

Measured + Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$4.03566.82 K oz0.090 g/t195.89 M t
Copper$33.95959.86 K t  4,900.000 g/t195.89 M t
Iron$27.5730.32 M t  154,800.000 g/t195.89 M t

Estimate notes: Serrote Deposit Mineral Resource as of February 2009.
0.3% Cu equivalent cut-off grade.

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$0.6490.47 K oz0.090 g/t31.27 M t
Copper$5.42153.21 K t  4,900.000 g/t31.27 M t
Iron$3.984.38 M t  140,100.000 g/t31.27 M t

Estimate notes:

Measured + Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$0.2839.03 K oz0.160 g/t7.59 M t
Copper$1.5343.25 K t  5,700.000 g/t7.59 M t
Iron$1.331.47 M t  193,400.000 g/t7.59 M t

Estimate notes: Caboclo deposit mineral resource as of February 2009.
0.3% CuEq cut-off.

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$0.1216.32 K oz0.110 g/t4.62 M t
Copper$0.9326.31 K t  5,700.000 g/t4.62 M t
Iron$0.60657.32 K t  142,400.000 g/t4.62 M t

Estimate notes:


 

San Andres

Latest NI43-101 Report: AMENDED AND RESTATED TECHNICAL REPORT RESOURCES AND RESERVES ON THE SAN ANDRES MINE IN THE MUNICIPALITY OF LA UNION, DEPARTMENT OF COPAN, HONDURAS
2009-08-12 (105 pages).

Updates: Mineral Reserve and Resource Estimate webpage (viewed November, 2011).

Project Location: La Union, Honduras.

Average Ore Value (all estimate types): US$30.67

Measured + Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$14.562.05 M oz0.530 g/t120.05 M t

Estimate notes:

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$5.06711.29 K oz0.630 g/t35.12 M t

Estimate notes:


 

Sao Francisco

Latest NI43-101 Report: RESOURCES AND RESERVES ON THE SAO FRANCISCO MINE, MATO GROSSO STATE, BRAZIL
2011-03-30 (70 pages).

Updates: Aura Minerals Announces Updated Resource and Reserve Estimates for Brazilian Gold Mines, November 10, 2011 news release.

Project Location: Mato Grosso, Brazil.

Average Ore Value (all estimate types): US$52.51

Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$2.37333.62 K oz0.950 g/t10.92 M t

Estimate notes: Indicated resource is inclusive of the reserves.
0.25 g/t cut-off (DLO) and 0.40 g/t (CGO) cut-off.

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$0.011.25 K oz0.470 g/t83.00 K t

Estimate notes:


 

Sao Vicente

Latest NI43-101 Report: RESOURCES AND RESERVES ON THE SAO VICENTE MINE IN THE MUNICIPALITY OF NOVA LACERDA, STATE OF MATO GROSSO BRAZIL
2011-03-30 (92 pages).

Updates: Aura Minerals Announces Updated Resource and Reserve Estimates for Brazilian Gold Mines November 10, 2011 news release.

Project Location: Mato Grosso, Brazil.

Average Ore Value (all estimate types): US$49.33

Measured + Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$1.24174.67 K oz0.910 g/t5.97 M t

Estimate notes: Measured + Indicated resources inclusive of reserves.
Reserves at cut-off of 0.25 g/t (DLO) and 0.40 g/t (CGO) cut-off.

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$0.034.30 K oz0.460 g/t291.00 K t

Estimate notes:

  Banner ad GoldMinerPulse.    

Web site design by SEO-upgrades.