Premier Gold Mines Ltd. (PG) NI 43-101 Metal Value Report

The Premier Gold Mines Ltd. website is at www.premiergoldmines.com.

Information Links: Yahoo News and Quotes | Yahoo Message Board | StockCharts

More Information Links: Premier Gold Fair Market Share Price Estimate updated daily.

Note

June 24, 2011: this report has been updated assuming the June 22, 2011 Goldstone acquisition is closed as announced.

GoldMinerPulse Metrics Summary

This report is based on NI 43-101 resource and reserve disclosures and fully diluted share counts available on 2011-06-24.

The GoldMinerPulse metrics, presented below in table format, are based on all projects and all in situ metals and are updated daily with closing market prices.

Premier Gold Mines Ltd. Metric Summary
General MetricValue on 2012-02-03
In Situ Metal Value per Share (MVpSh)US$64.98
Average Ore Value per TonneUS$239.94
Metal Value Leverage (MVL)10.92
Market Capitalization as a Percentage of Metal Value9.2%
Recent Closing Stock PriceC$5.91
[note 1]
Fully Diluted Share Count130.45 M
[note 2]
Percentage In Situ Proven + Probable Reserve0%
Percentage In Situ Measured + Indicated Resource60%
Percentage In Situ Inferred Resource40%
Gold Specific Metrics
MetricValue on 2012-02-03
Gold Reserves + Resources4.91 M oz
Average Gold Ore Grade4.3 g/t
Market Capitalization per oz of Gold In SituUS$158.04
( C$156.97 )
Gold Equivalent Ounces Estimate4.91 M oz
Market Capitalization per oz of Gold EquivalentUS$158.04
( C$156.97 )
 

GoldMinerPulse Most Optimistic Resource Estimate Summary (MORE)

All metal counts in this section are based on the combined Proven + Probable reserves plus the Measured + Indicated and Inferred resources.

Metal Summary Based on Closing Prices on 2012-02-03
Metric / MetalGold
Total Counts (reserves + resources)4.91 M oz
Metal Prices in US$ (from 2012-02-03)$1,725.90 / oz
Metal Value per Share (MVpSh)
Shown in US$. Based on fully diluted share count
$64.98
Percentage of Total Metal Value100.00%
Metal Value Percentage Proven + Probable0%
Metal Value Percentage Measured + Indicated60%
Metal Value Percentage Inferred40%

The above metal value totals derive from the following projects.

Project/Deposit/Mine Summary Based on Closing Prices on 2012-02-03
Project Location Metal Value per
share (% total)
Average
Ore Value
US$/t
GoldPP%MI%I%
HardrockOntario, Canada$47.82 ( 73.6% )US$226.273.61 M oz069%31%
BrookbankOntario, Canada$11.25 ( 17.3% )US$326.41850.28 K oz051%49%
Rahill-BonanzaOntario, Canada$5.91 ( 9.1% )US$236.38446.76 K oz00100%

 

Brookbank

Latest NI43-101 Report: TECHNICAL REPORT ON THE BROOKBANK GOLD DEPOSIT, BEARMORE-GERALDTON AREA, NORTHERN ONTARIO, CANADA
2009-05-04 (146 pages).

Updates: Summary of Mineral Resources at 2.0 g/t Au Cut-off, webpage (viewed June 2011).

Project Location: Ontario, Canada.

Average Ore Value (all estimate types): US$326.41

Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$5.71431.92 K oz7.300 g/t1.84 M t

Estimate notes:
2.0 g/t Au Cut=off, High Assays Un-cut.

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$5.54418.36 K oz4.900 g/t2.66 M t

Estimate notes:


 

Hardrock

Latest NI43-101 Report: TECHNICAL REPORT ON THE UPDATED MINERAL RESOURCE ESTIMATE FOR THE HARDROCK GOLD PROPERTY GERALDTON, ONTARIO, CANADA
2011-04-05 (159 pages).

Updates: PREMIER GOLD REPORTS UPDATED NI 43-101 RESOURCE FOR HARDROCK PROJECT, April 6, 2011 News Release.

Project Location: Ontario, Canada. View the Hardrock project on a Google Map.

Average Ore Value (all estimate types): US$226.27

Measured + Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$32.972.49 M oz3.732 g/t20.77 M t

Estimate notes: See Table 1.3 Hardrock Project Mineral Resource Estimate on p. 18 of 159 of the technical report dated April 2011.
A total of 12 individual mineralized domains were identified and estimated using an average top cut of 48 g/t Au. For a “potential open pit” mineral resource a cut-off grade of 0.83 g/t Au is based on a Whittle optimized pit shell and a mining recovery of 100%. For potential underground mineral resources a cut-off grade of 2.80 g/t Au and an assumed mining recovery of 100% outside of the potential open pit mining areas was used.

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$14.851.12 M oz5.133 g/t6.80 M t

Estimate notes:


 

Rahill-Bonanza

Latest NI43-101 Report: Technical Report On Rahill-Bonanza Project, Dome Township, Red Lake M. D., Ontario For Premier Gold Mines Limited
2008-03-28 (66 pages).

Project Location: Ontario, Canada. View the Rahill-Bonanza project on a Google Map.

Average Ore Value (all estimate types): US$236.38

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$5.91446.76 K oz4.260 g/t6.66 M t

Estimate notes: See Table 5 Inferred Resource Bonanza Deposit (2.0 g/t Au cut-off) on p. 40 of 66 in the NI 43-101 dated March 2008.
Resource quantities adjusted for ownership percentage of 49.0%.