GoldMinerPulse Report: Sabina Gold & Silver Corporation Metal Value



Seabridgegold.net    

Sabina Gold & Silver Corporation (SBB) NI 43-101 Metal Value Report

The Sabina Gold & Silver Corporation website is at www.sabinasilver.com.

Information Links: Yahoo News and Quotes | Yahoo Message Board | StockCharts | Canadian Insider Trading

GoldMinerPulse Metrics Summary

This report is based on NI 43-101 resource and reserve disclosures and fully diluted share counts available on 2011-11-21.

The GoldMinerPulse metrics, presented below in table format, are based on all projects and all in situ metals and are updated daily with closing market prices.

Sabina Gold & Silver Corporation Metric Summary
General MetricValue on 2012-02-03
In Situ Metal Value per Share (MVpSh)US$72.04
Average Ore Value per TonneUS$267.05
Metal Value Leverage (MVL)18.83
Market Capitalization as a Percentage of Metal Value5.3%
Recent Closing Stock PriceC$3.8
[note 1]
Fully Diluted Share Count169.47 M
[note 2]
Percentage In Situ Proven + Probable Reserve0%
Percentage In Situ Measured + Indicated Resource68%
Percentage In Situ Inferred Resource32%
Gold Specific Metrics
MetricValue on 2012-02-03
Gold Reserves + Resources6.03 M oz
Average Gold Ore Grade5.8 g/t
Market Capitalization per oz of Gold In SituUS$107.48
( C$106.76 )
Gold Equivalent Ounces Estimate7.07 M oz
Market Capitalization per oz of Gold EquivalentUS$91.66
( C$91.04 )
Silver Specific Metrics
MetricValue on 2012-02-03
Silver Reserves + Resources53.43 M oz
Average Silver Ore Grade80.4 g/t
Market Capitalization per oz of Silver In SituUS$12.14
( C$12.05 )
Silver Equivalent Ounces Estimate363.01 M oz
Market Capitalization per oz of Silver EquivalentUS$1.79
( C$1.77 )
 

GoldMinerPulse Most Optimistic Resource Estimate Summary (MORE)

All metal counts in this section are based on the combined Proven + Probable reserves plus the Measured + Indicated and Inferred resources.

Metal Summary Based on Closing Prices on 2012-02-03
Metric / MetalGoldSilver
Total Counts (reserves + resources)6.03 M oz53.43 M oz
Metal Prices in US$ (from 2012-02-03)$1,725.90 / oz$33.63 / oz
Metal Value per Share (MVpSh)
Shown in US$. Based on fully diluted share count
$61.43$10.60
Percentage of Total Metal Value85.28%14.72%
Metal Value Percentage Proven + Probable0%0%
Metal Value Percentage Measured + Indicated67%76%
Metal Value Percentage Inferred33%24%

The above metal value totals derive from the following projects.

Project/Deposit/Mine Summary Based on Closing Prices on 2012-02-03
Project Location Metal Value per
share (% total)
Average
Ore Value
US$/t
GoldSilverPP%MI%I%
Back RiverNunavut, Canada$61.43 ( 85.3% )US$322.336.03 M oz 067%33%
Hackett RiverNunavut, Canada$10.60 ( 14.7% )US$133.95 53.43 M oz076%24%

 

Back River

Latest NI43-101 Report: TECHNICAL REPORT ON THE GOOSE LAKE PROPERTY OF THE BACK RIVER PROJECT, NUNAVUT TERRITORY, CANADA
2011-03-31 (140 pages).

Updates: Sabina Announces Increase in Resource Estimate for Back River Gold Project, Nunavut news release, November 21, 2011.

Project Location: Nunavut, Canada. View the Black River project on a Google Map.

Average Ore Value (all estimate types): US$322.33

Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$41.044.03 M oz5.620 g/t22.30 M t

Estimate notes:

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$20.402.00 M oz6.230 g/t10.00 M t

Estimate notes:


 

Hackett River

Latest NI43-101 Report: Preliminary Economic Assessment Update NI 43-101 Technical Report Hackett River Project, Nunavut, Canada
2010-07-26 (389 pages).

Updates: Project percentages adjusted to reflect 2011 Xtratra deal -- 22.5% of first 190 million ounces of silver (and 12.5% of all silver product thereafter. Other metals are not shown.

Project Location: Nunavut, Canada. View the Hackett River Polymetallic project on a Google Map.

Average Ore Value (all estimate types): US$133.95

Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Silver$8.0640.64 M oz128.750 g/t43.64 M t

Estimate notes: See Table 1-1: Hackett River Diluted Resource Summary on p. 24 of 389 in the NI 43-101 dated July 2010.
Resource quantities adjusted for ownership percentage of 22.5%.

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Silver$2.5412.79 M oz110.600 g/t15.98 M t

Estimate notes: See Indicated note.
Resource quantities adjusted for ownership percentage of 22.5%.

  Banner ad GoldMinerPulse.    

Web site design by SEO-upgrades.