|
||||||||||||||||||
|
![]() |
![]() |
Company Web Site: www.sangoldcorp.com
(NI) 43-101 reports from projects located in: Canada (CA)
This report is based on NI 43-101 disclosures and fully diluted share counts available on: 2010-03-01. Metrics have been updated with stock price and metal prices in effect at the close of Canadian markets on 2010-03-11.
External Links: Yahoo News and Quotes | Yahoo Message Board | StockCharts | Stockhouse | Canadian Insider Trading
More External Links:
San Gold Fair Market Stock Price Valuation is updated daily.Recent Production
Source(s): Production figures taken from the Management's Discussion and Analysis For the three and nine months ended September 30th, 2009 document available at Sedar.
- 2009 : 8398 oz during Q3
- 2008 : 2,276 oz during Q3
GoldMinerPulse Most Optimistic Resource Estimate Summary (MORE):
Metrics last with prices in effect at the TSX/TSXV close on 2010-03-11
Project/Deposit CC MVpSh PP% MI% I% Gold 007 Zone CA $6.55 0 29% 71% 1.65 M oz Rice Lake CA $5.92 0 25% 75% 1.49 M oz Hinge CA $3.41 0 31% 69% 860.26 K oz GoldMinerPulse Metrics - Total All Projects/Deposits by Metal, prices from 2010-Mar-11 Metric / Metal Gold Metal Totals 4.01 M oz Metal Prices in US$ (from 2010-03-11) $1,108.90 per oz Metal Value per Share (MVpSh)
(Shown in US$ and based on fully diluted share count shown below)$15.88 Percentage of Total Metal Value 100.00% PP% | MI% | I% 0 | 28% | 72% GoldMinerPulse Metrics - All Metals from All Projects/Deposits and Prices from 2010-Mar-11 Metal Value per Share (MVpSh) US$15.88 Average Ore Value per Tonne US$ Metal Value Leverage (MVL) 5.03 Market Capitalization as % of Metal Value 19.9% Recent Stock Price C$3.23 (TSX/TSXV close on 2010-03-11.)
Conversion rate used: 1 Cnd$ = 0.976275 US$ )Fully Diluted Share Count 279.79 M ( Fully diluted share count taken from the San Gold Corp., Share Structure web page (viewed December 2009). ) PP% | MI% | I% 0 | 28% | 72% Gold Metrics-- all Projects/Deposits Average Gold Ore Grade g/t Market Capitalization
per oz of Gold In Ground$220.25 US$ | 225.60 C$ Gold Eq Oz Estimate 4.01 M oz ( 4.01 M oz are in ground) Market Capitalization
per oz of Gold Equilavent$220.25 US$ | 225.60 C$ See terms for more about GoldMinerPulse metrics. GoldMinerPulse Coverage Status:
- GoldMinerPulse coverage of San Gold Corporation is complete pending a final internal review.
(NI) 43-101 Report:
Title:
Date: (0 pages)
Project Location: Manitoba, Canada
Most Optimistic Resource Estimates (MORE):
•Measured + Indicated•Inferred
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $1.89 477.48 K oz 21.600 g/t 687.56 K t Estimate notes: Marketwire San Gold Presents Initial Mineral Resource Estimates for Hinge and 007 Zones.
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $4.66 1.18 M oz 21.900 g/t 1.67 M t Estimate notes: See Measured + Indicated note.
(NI) 43-101 Report:
Title:
Date: (0 pages)
Updates: Marketwire San Gold Presents Initial Mineral Resource Estimates for Hinge and 007 Zones.
Project Location: Manitoba, Canada
Map View: View the Hinge Mine on a Google Map.
Most Optimistic Resource Estimates (MORE):
•Measured + Indicated•Inferred
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $1.06 267.80 K oz 13.400 g/t 621.60 K t Estimate notes:
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $2.35 592.46 K oz 13.400 g/t 1.38 M t Estimate notes: See Measured + Indicated note.
cutOffNotes
(NI) 43-101 Report:
Title: MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES AS OF DECEMBER 1, 2006 RICE LAKE PROJECT RICE LAKE GREENSTONE BELT BISSETT, MANITOBA, CANADA FOR SAN GOLD CORPORATION.
Date: 2006-12-11 (160 pages)
Updates: Also see Reserves & Resources web page at the San Gold web site (viewed December 2009).
Project Location: Manitoba, Canada
Map View: View Rice Lake Mine site on a Google Map.
Most Optimistic Resource Estimates (MORE):
•Measured + Indicated•Inferred
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $1.46 367.15 K oz 8.087 g/t 1.41 M t Estimate notes: See Reserves & Resources web page at the San Gold web site (viewed December 2009). Proven and Probable are included as part of the Measured + Indicated count.
Metal MVpSh Contained Metal Quantity Ore Grade Ore Quantity Gold $4.46 1.13 M oz 8.087 g/t 4.33 M t Estimate notes: See Measured + Indicated note.
![]() |
![]() |
![]() |
![]() |
|
| PartyCasino is the online casino operated by PartyGaming Plc. PartyGaming Plc is listed on the London Stock Exchange and is part of the FTSE 250 in the Travel & Leisure sector. | ||||