GoldMinerPulse Report: Treasury Metals Inc. Metal Value

This page is now out of date. Please visit GoldMinerPulse Home Page to access current pages, which are now updated with daily market closing prices and sedar.com document filings.



Get Adobe Flash player Seabridgegold.net    

Treasury Metals Inc. (TML) NI 43-101 Metal Value Report

Treasury Metals Inc. is a mineral exploration and development company with a growth orientated strategy to acquire and develop advanced gold assets. Treasury Metals has a strong and sizable shareholder base and cash flow from a gold royalty. [source: Company factsheet, viewed online September 2010].

The Treasury Metals Inc. website is at www.treasurymetals.com.

Information Links: Yahoo News and Quotes | Yahoo Message Board | StockCharts | Canadian Insider Trading

GoldMinerPulse Metrics Summary

This report is based on NI 43-101 resource and reserve disclosures and fully diluted share counts available on 2011-07-04.

The GoldMinerPulse metrics, presented below in table format, are based on all projects and all in situ metals and are updated daily with closing market prices.

Treasury Metals Inc. Metric Summary
General MetricValue on 2013-05-22
In Situ Metal Value per Share (MVpSh)US$56.15
Average Ore Value per TonneUS$56.41
Metal Value Leverage (MVL)-no stock price-
Market Capitalization as a Percentage of Metal Value - price unavailable
Recent Closing Stock PriceC$
[note 1]
Fully Diluted Share Count48.73 M
[note 2]
Percentage In Situ Proven + Probable Reserve0%
Percentage In Situ Measured + Indicated Resource28%
Percentage In Situ Inferred Resource72%
Gold Specific Metrics
MetricValue on 2013-05-22
Gold Reserves + Resources1.90 M oz
Average Gold Ore Grade1.2 g/t
Market Capitalization per oz of Gold In SituUS$0.00
( C$0.00 )
Gold Equivalent Ounces Estimate2.00 M oz
Market Capitalization per oz of Gold EquivalentUS$0.00
( C$0.00 )
 

GoldMinerPulse Most Optimistic Resource Estimate Summary (MORE)

All metal counts in this section are based on the combined Proven + Probable reserves plus the Measured + Indicated and Inferred resources.

Metal Summary Based on Closing Prices on 2013-05-22
Metric / MetalGoldSilverCopperLeadZinc
Total Counts (reserves + resources)1.90 M oz3.62 M oz1.16 K t7.91 K t16.81 K t
Metal Prices in US$ (from 2013-05-22)$1,364.80 / oz$22.29 / oz$3.34 / lb$0.92820 / lb$0.83350 / lb
Metal Value per Share (MVpSh)
Shown in US$. Based on fully diluted share count
$53.35$1.66$0.18$0.33$0.63
Percentage of Total Metal Value95.02%2.95%0.31%0.59%1.13%
Metal Value Percentage Proven + Probable0%0%0%0%0%
Metal Value Percentage Measured + Indicated28%20%26%34%34%
Metal Value Percentage Inferred72%80%74%66%66%

The above metal value totals derive from the following projects.

Project/Deposit/Mine Summary Based on Closing Prices on 2013-05-22
Project Location Metal Value per
share (% total)
Average
Ore Value
US$/t
GoldSilverCopperLeadZincPP%MI%I%
Goliath GoldOntario, Canada$36.22 ( 64.5% )US$126.081.19 M oz3.62 M oz1.16 K t7.91 K t16.81 K t023%77%
Pico MachayHuancavelica, Peru$19.93 ( 35.5% )US$28.15711.50 K oz 037%63%
Royalty: Cerro Colorado Gold MineSonora, Mexico$0.00 ( 0.0% )  000
GoldcliffOntario, Canada$0.00 ( 0.0% )  000

 

Goldcliff

Treasury Metals new gold exploration property is located 50 km south of Dryden along a distinct NE-SW shear zone that also hosts the past producers of the Goldrock Camp. The Goldcliff property is also contiguous to Mantiou Gold (reported 53.7 kg per tonne au over a core length of 0.55 m)

In 2010 Treasury Metals geologists conducted field mapping and prospecting on the property discovering several gold showings including grab sample assays up to 106.4 g/t Au.

[Source: Project webpage (viewed May 2011)]

Latest NI43-101 Report:
(0 pages).

Project Location: Ontario, Canada.


 

Goliath Gold

The Goliath Gold Project is located in Northwestern Ontario, 20 km east of Dryden and 2 km north of the TransCanada Highway. The location is also served by power lines, gas supply, water supply and existing workshops, offices and storage facilities. The City of Dryden and Wabigoon Lake First Nation are well equipped with skilled personnel and services to support mine development. The property is 100% owned by Treasury Metals Inc. [Source: Project webpage (viewed May 2011)]

Latest NI43-101 Report: TECHNICAL REPORT AND PRELIMINARY ECONOMIC ASSESSMENT ON THE GOLIATH GOLD PROJECT
2010-07-09 (417 pages).

Project Location: Ontario, Canada.

Average Ore Value (all estimate types): US$126.08

Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$7.65273.28 K oz2.500 g/t3.40 M t
Silver$0.33721.46 K oz6.600 g/t3.40 M t
Copper$0.050.30 K t  88.000 g/t3.40 M t
Lead$0.112.72 K t  800.000 g/t3.40 M t
Zinc$0.215.68 K t  1,670.000 g/t3.40 M t

Estimate notes: See table on p. 7 of 417 in the NI43-101 dated July 2010.
Cut-off grate was 0.5 g/t for surface and 2.0 g/t for underground.

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$25.77920.15 K oz2.700 g/t10.60 M t
Silver$1.332.90 M oz8.500 g/t10.60 M t
Copper$0.130.86 K t  81.000 g/t10.60 M t
Lead$0.225.19 K t  490.000 g/t10.60 M t
Zinc$0.4211.13 K t  1,050.000 g/t10.60 M t

Estimate notes: See Indicated note.


 

Pico Machay

The Pico Machay Gold Project ("Pico Machay" or the "Project") is a high-sulphidation gold deposit that lies within the northern extent of the Southern Peru Epithermal Gold-Silver Belt, which is one of three epithermal gold-silver belts in Peru that are host to world-class gold deposits, including the producing Yanacocha and Pierina mines. The Project is a near-term mine development stage asset and preliminary engineering and metallurgical test work will support a low cost, low stripping ratio, heap leach operation.
...
... has agreed to pay a total of US$21 million in cash and the issuance of 11.5 million common shares (the "Shares"). Treasury Metals has agreed to issue 1.0 million common shares to Pan American at the time of signing, with the balance of 10.5 common shares to be issued upon the closing of the Transaction. Pan American will hold approximately 19.70% of the issued and outstanding common shares of the Company [Source: Treasury Metals to Acquire Pico Machay Gold Project from Pan American Silver]

Latest NI43-101 Report: INDEPENDENT TECHNICAL REPORT AND RESOURCE ESTIMATE PICO MACHAY GOLD PROJECT HUANCAVELICA PROVINCE, PERU
2011-04-30 (260 pages).

Project Location: Huancavelica, Peru. View the Pico Machay Gold project on a Google Map.

Average Ore Value (all estimate types): US$28.15

Measured + Indicated

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$7.45265.82 K oz0.780 g/t10.60 M t

Estimate notes: See p. 5 of 260 in the NI43-101 dated April 2011.
mixed + non-oxidised, block cut-off grade of 0.3 g/tonne.

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$12.48445.67 K oz0.580 g/t23.90 M t

Estimate notes:


 

Royalty: Cerro Colorado Gold Mine

In 2007, the Treasury Metals acquired from Laramide a sliding production royalty, net of withholding tax, based on gold prices and the aggregate production from a mine, less direct selling costs. As of December 31, 2010, the royalty rate was 3.0%.

[Source: December 2010 Financial Filing]

The projected 2011 gold output from Cerro Colorado is 25,000 oz gold (see Goldgroup project webpage (viewed May 2011).

Latest NI43-101 Report:
(0 pages).

Project Location: Sonora, Mexico.