GoldMinerPulse Report: Trelawney Mining and Exploration Inc. Metal Value



Seabridgegold.net    

Trelawney Mining and Exploration Inc. (TRR) NI 43-101 Metal Value Report

Trelawney is focusing its exploration efforts in Chester Township, Porcupine Mining Division, in central Ontario, with a goal of becoming a new mid-tier gold mining company. [Source: December 2010 MD&A Filing]

The Trelawney Mining and Exploration Inc. website is at www.trelawneyresources.com.

Information Links: Yahoo News and Quotes | Yahoo Message Board | StockCharts | Canadian Insider Trading

More Information Links:

Trelawney Valuation Blog

GoldMinerPulse Metrics Summary

This report is based on NI 43-101 resource and reserve disclosures and fully diluted share counts available on 2011-12-05.

The GoldMinerPulse metrics, presented below in table format, are based on all projects and all in situ metals and are updated daily with closing market prices.

Trelawney Mining and Exploration Inc. Metric Summary
General MetricValue on 2012-02-03
In Situ Metal Value per Share (MVpSh)US$48.70
Average Ore Value per TonneUS$60.69
Metal Value Leverage (MVL)14.52
Market Capitalization as a Percentage of Metal Value6.9%
Recent Closing Stock PriceC$3.33
[note 1]
Fully Diluted Share Count174.37 M
[note 2]
Percentage In Situ Proven + Probable Reserve0%
Percentage In Situ Measured + Indicated Resource0%
Percentage In Situ Inferred Resource100%
Gold Specific Metrics
MetricValue on 2012-02-03
Gold Reserves + Resources4.92 M oz
Average Gold Ore Grade1.1 g/t
Market Capitalization per oz of Gold In SituUS$118.82
( C$118.02 )
Gold Equivalent Ounces Estimate4.92 M oz
Market Capitalization per oz of Gold EquivalentUS$118.82
( C$118.02 )
 

GoldMinerPulse Most Optimistic Resource Estimate Summary (MORE)

All metal counts in this section are based on the combined Proven + Probable reserves plus the Measured + Indicated and Inferred resources.

Metal Summary Based on Closing Prices on 2012-02-03
Metric / MetalGold
Total Counts (reserves + resources)4.92 M oz
Metal Prices in US$ (from 2012-02-03)$1,725.90 / oz
Metal Value per Share (MVpSh)
Shown in US$. Based on fully diluted share count
$48.70
Percentage of Total Metal Value100.00%
Metal Value Percentage Proven + Probable0%
Metal Value Percentage Measured + Indicated0%
Metal Value Percentage Inferred100%

The above metal value totals derive from the following projects.

Project/Deposit/Mine Summary Based on Closing Prices on 2012-02-03
Project Location Metal Value per
share (% total)
Average
Ore Value
US$/t
GoldPP%MI%I%
Cote LakeOntario, Canada$38.56 ( 79.2% )US$55.493.90 M oz00100%
JeromeOntario, Canada$10.14 ( 20.8% )US$94.331.02 M oz00100%

 

Cote Lake

The Chester Project is located in Ontario between Sudbury and Timmins just off highway 144. The town of Gogama is 20 km to the northeast. Geologically, the project sits at the southeastern tip of the SWAYZE Archean Greenstone Belt. Trelawney's Chester Project is close to a major regional fault located just to the north of the project which appears to be a southwestern extension of the Cadillac-Larder Lake Fault Zone which runs through the Kirkland Lake area. The Destor Porcupine Fault Zone is a similar fault zone which runs through the gold deposits of the Timmins area. These large regional faults are in close proximity to some of Canada's most productive gold camps with more than 68 Million ounces in the Timmins Camp and 42 million ounces in the Kirkland Lake district. [Source: Chester Township Property webpage (viewed May 2011)]

Latest NI43-101 Report: Technical Report on the Cote Lake Deposit, Chester Property, Ontario, Canada
2011-04-21 (148 pages).

Project Location: Ontario, Canada.

Average Ore Value (all estimate types): US$55.49

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$38.563.90 M oz1.000 g/t131.00 M t

Estimate notes: See Table 17-1 Cote Lake Mineral Resource Estimate - March 4, 2011 on p. 84 of 148 in the April 2011 technical report.
Resource quantities adjusted for ownership percentage of 92.5%.
Cut-off grade 0.3 g/t


 

Jerome

Latest NI43-101 Report: TECHNICAL REPORT ON A RESOURCE ESTIMATE ON THE JEROME MINE PROPERTYnada
2011-08-06 (92 pages).

Project Location: Ontario, Canada.

Average Ore Value (all estimate types): US$94.33

Inferred

MetalMVpShContained Metal QuantityOre GradeOre Quantity
Gold$10.141.02 M oz1.700 g/t18.74 M t

Estimate notes: See p. 10 of 92 in the technical report dated August, 2011.
Cut-off grade 0.3 g/t

  Banner ad GoldMinerPulse.    

Web site design by SEO-upgrades.